On August 22, Mr Arnold submitted a proposal to "Tear out & replace a sidewalk, drive and curb" "all concrete will be #mix" for $4, I was concerned about what mix of cement would be used MrArnold said he would "guarantee the work and if there was a problem, he would tear it out and replace it." The work on the drive begin on September 21,and ended on September when MrArnold was paid in fullThe cement was poured in main sections and then the entrance After one side was poured and began to sMrArnold was struggling to smooth out the driveAfter the form was removed from the first pouring, My son measured the thickness along the side of the driveIt ranged from inches to inchesIt was obvious that the ground was not compacted evenly to insure a consistent level of concrete throughout On the morning of January 27, 2016, cracks appeared on the drive Two separate cracks which were in proximity of each other ran the entire width of the
On August 22, Mr Arnold submitted a proposal to "Tear out & replace a sidewalk, drive and curb" "all concrete will be #mix" for $4, I was concerned about what mix of cement would be used MrArnold said he would "guarantee the work and if there was a problem, he would tear it out and replace it." The work on the drive begin on September 21,and ended on September when MrArnold was paid in fullThe cement was poured in main sections and then the entrance After one side was poured and began to sMrArnold was struggling to smooth out the driveAfter the form was removed from the first pouring, My son measured the thickness along the side of the driveIt ranged from inches to inchesIt was obvious that the ground was not compacted evenly to insure a consistent level of concrete throughout On the morning of January 27, 2016, cracks appeared on the drive Two separate cracks which were in proximity of each other ran the entire width of the