Sign in

Bartell Home Improvements

Sharing is caring! Have something to share about Bartell Home Improvements? Use RevDex to write a review

Bartell Home Improvements Reviews (1)

Tell us why hereOn 9/24/a Design Agreement was entered with the [redacted] s, which was to prepare a set of blueprints of a floor plan, elevations as needed, sections, an outline of specifications and an approximate price quoteThe [redacted] s wanted to take care of the soil engineering as Mr [redacted] worked for a local soil engineering companyA property survey, site plan, structural engineering drawings, floor plan, elevations and a proposal were completed and gone over with the [redacted] s On 4/3/a construction contract was entered between both partiesOn 4/10/application for building permits were applied for with City and County of Denver, and from Denver an estimated completed review date of 5/8/15.This date was given to the clients as the date the permits could be expected from the City of DenverThe estimate date of 5/8/came and went with no communication form Denver the permits were ready, their website showed the permits were still under review, weekly emails and phone calls to Denver went unansweredEven weekly visits to the building department and discussion with the reps showed the permits were still under reviewOn 6/2/we spoke to [redacted] ***, we received information that the city was 4-weeks behind schedule an estimate projects behind according to him4-weeks went by and no new information from the City, the permits still showed they were still under reviewThere was clear communication with the [redacted] s via email, phone calls, and site visitsWe continued to contact the plan reviewer assigned the permit and their supervisor, and the department supervisorWe did not receive any communication returned by the CityWe even supplied to the [redacted] s a news article from the Denver Post (http://www.denverpost.com/n...tors-waiting-permit s-struggle-start-projects) illustrating we were not the only ones being held upWe received the first review from the City beginning of September with comments concerning the building plansAgain this was communicated to the [redacted] s via email and phone callsThe changes were made to the plans; all which had to be done be each respective professional and returned to usThis did take some timeThe plans were resubmitted to the City again for reviewWe received another set of comments on the building plans end of October 2015, this time the City wanted a shoring Letter with plans stamped by the engineer and valuationWe contacted Mr [redacted] to have this information to be provided to us since the soils report was done by the company he works (as mentioned)The explanation given to us was this could not happen because the engineer that did the work for them was no longer with the engineering company he worked for and if we could take upon getting the additional informationWe sent out information to another soils engineer in order to gather the information needed for the CityAfter the engineer examined the soils report and other information, they turned down the work but referred us to another soil engineerThis occurred multiple times until the last engineer explained they could not take up the report of another engineer and add to it because it was against the lawThey only way for them to do the work was to start at the beginning and provide a new reportWe contacted Mr [redacted] and explained the situation with having another soil engineer picking up the work, and that the best option was he need to have his company just to provide the information need; Mr [redacted] was reluctant to have to go back.to his company he worked for but he didWe received the shoring report and information from Mr [redacted] after the New Year’s HolidayOnce we had the information we sent the information to the structural engineer, started bidding on the work for valuation in order to turn into the City to obtain permitsAgain this was communicated via emails and phone callsSoon after we received a call from Mr [redacted] to look into changing the plans which included a basement to only a crawl spaceWe explained we would need gather information from engineers and look at cost in order to provide them with the information needed to make the best decisionAs we were working on getting information for the new foundation and holding on getting permits based on the original plans; 2/2/we were contacted by Mr [redacted] stating they wished to cancel the projectThe reason we were given was because they were looking to move out of stateWe asked them to send a signed letter to us for proper documenting the wish to cancel the contract; and the contract would be canceled as outlined in the contract.We received a certified letter post marked 2/22/detailing the request to cancel the contractA letter was sent to the [redacted] s in an act of good faith; within due time we would follow up with them after we have done a final accounting of the project as outlined in the Design Agreement and Construction Contract

Check fields!

Write a review of Bartell Home Improvements

Satisfaction rating
 
 
 
 
 
Upload here Increase visibility and credibility of your review by
adding a photo
Submit your review

Bartell Home Improvements Rating

Overall satisfaction rating

Add contact information for Bartell Home Improvements

Add new contacts
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | New | Updated