Attached is a copy of the letter to the residents of [redacted] ***, [redacted] and [redacted] at [redacted] concerning the splash pad amenity that is the topic of [redacted] ’s complaint along with the letter to the residents from [redacted] that is mentioned in the current letter In Ms [redacted] ’s complaint, she questioned whether the site of this splash pad amenity is currently encumbered by the floodplain Attached are copies of the following concerning the floodway and floodplain in the area: As-built Lot Elevations exhibit prepared by [redacted] The location of the splash pad amenity is within the area labeled [redacted] (located north of [redacted] and west of [redacted] ***) [redacted] determinations for the following subdivisions verifying the lots within the yrfloodplain (according to ***’s Flood Insurance Rate Map) on the above exhibit have been filled and removed from the yrfloodplain: a [redacted] Secb [redacted] Secand Partial Replat Noc [redacted] Secand Partial Replat No Please let us know if you have any further questions [redacted] Land Tejas Companies, Ltd
Attached is a copy of the letter to the residents of [redacted], [redacted] and [redacted] at [redacted] concerning the splash pad amenity that is the topic of [redacted]’s complaint along with the letter to the residents from [redacted] that is mentioned in the current letter....
In Ms. [redacted]’s complaint, she questioned whether the site of this splash pad amenity is currently encumbered by the floodplain. Attached are copies of the following concerning the floodway and floodplain in the area: 1. As-built Lot Elevations exhibit prepared by [redacted]. The location of the splash pad amenity is within the area labeled [redacted] (located north of [redacted] and west of [redacted]). 2. [redacted] determinations for the following subdivisions verifying the lots within the 100 yr. floodplain (according to [redacted]’s Flood Insurance Rate Map) on the above exhibit have been filled and removed from the 100 yr. floodplain: a. [redacted] Sec. 3 b. [redacted] Sec. 3 and 7 Partial Replat No. 1 c. [redacted] Sec. 3 and 7 Partial Replat No. 2 Please let us know if you have any further questions. [redacted] Land Tejas Companies, Ltd.
Attached is a copy of the letter to the residents of [redacted] ***, [redacted] and [redacted] at [redacted] concerning the splash pad amenity that is the topic of [redacted] ’s complaint along with the letter to the residents from [redacted] that is mentioned in the current letter In Ms [redacted] ’s complaint, she questioned whether the site of this splash pad amenity is currently encumbered by the floodplain Attached are copies of the following concerning the floodway and floodplain in the area: As-built Lot Elevations exhibit prepared by [redacted] The location of the splash pad amenity is within the area labeled [redacted] (located north of [redacted] and west of [redacted] ***) [redacted] determinations for the following subdivisions verifying the lots within the yrfloodplain (according to ***’s Flood Insurance Rate Map) on the above exhibit have been filled and removed from the yrfloodplain: a [redacted] Secb [redacted] Secand Partial Replat Noc [redacted] Secand Partial Replat No Please let us know if you have any further questions [redacted] Land Tejas Companies, Ltd
Attached is a copy of the letter to the residents of [redacted], [redacted] and [redacted] at [redacted] concerning the splash pad amenity that is the topic of [redacted]’s complaint along with the letter to the residents from [redacted] that is mentioned in the current letter....
In Ms. [redacted]’s complaint, she questioned whether the site of this splash pad amenity is currently encumbered by the floodplain. Attached are copies of the following concerning the floodway and floodplain in the area: 1. As-built Lot Elevations exhibit prepared by [redacted]. The location of the splash pad amenity is within the area labeled [redacted] (located north of [redacted] and west of [redacted]). 2. [redacted] determinations for the following subdivisions verifying the lots within the 100 yr. floodplain (according to [redacted]’s Flood Insurance Rate Map) on the above exhibit have been filled and removed from the 100 yr. floodplain: a. [redacted] Sec. 3 b. [redacted] Sec. 3 and 7 Partial Replat No. 1 c. [redacted] Sec. 3 and 7 Partial Replat No. 2 Please let us know if you have any further questions. [redacted] Land Tejas Companies, Ltd.