Poor Quality.. don't use them unless you want to do a lot of fix up work after.
I really wanted to like this place, and Ken the owner (I think). However, unless you are really handy, don't go with them. Also, seemed very expensive (over $7k) for the work they did (or didn't do).
He was fairly responsive, and the creas he used were nice enough, but quality and follow up just wasn't here...

Here are the issues I had in case you do go with them to be aware of:

- Filthy mess left all the time, staples everywhere, nails in the driveway, and sticking out of plywood bent over.
- Cracked wood and gaps in supports.
- Drilled hole through one of my outlets
- No support under one end of plywood, thought it would break when I went up there and stepped on it, it bowed.
- One piece of plywood not even nailed or screwed down
- Gaps and jagged cuts in plywood seems, used black tape to cover them.
- Spackle and other mess on my existing doors, windows, etc left and hard to clean and get off
- Pull down stairway not done correctly, had to cut bottom feet to lay straight.

I reached out to them several times, and they never came to fix the issues I mentioned at any time. I will complete the rest myself, It's easier that way.
Just be careful out there when choosing a contractor.
Poor Quality.. don't use them unless you want to do a lot of fix up work after.
Poor Quality.. don't use them unless you want to do a lot of fix up work after.
Poor Quality.. don't use them unless you want to do a lot of fix up work after.
Poor Quality.. don't use them unless you want to do a lot of fix up work after.
Poor Quality.. don't use them unless you want to do a lot of fix up work after.
Poor Quality.. don't use them unless you want to do a lot of fix up work after.
Poor Quality.. don't use them unless you want to do a lot of fix up work after.
Poor Quality.. don't use them unless you want to do a lot of fix up work after.
Poor Quality.. don't use them unless you want to do a lot of fix up work after.
Poor Quality.. don't use them unless you want to do a lot of fix up work after.
Poor Quality.. don't use them unless you want to do a lot of fix up work after.

Contractor was hired to perform a home remodeling project. Work was not performed properly and was not completed, causing losses of [redacted] On February 4, 2012, I retained BayState to landscape and re-grade my property at [redacted] for a price of [redacted] On March 10, 2012, I retained BayState to also remodel my existing garage at my home into a kitchen and to remodel my existing kitchen into a living room for a price of [redacted] On March 28, 2012 we modified the garage remodeling project to add an additional cabinet and trash bin for an additional price of [redacted] On March 28, 2012 I paid BayState [redacted] to begin work on the projects, additional [redacted] on April 13, 2012, [redacted] on April 13, 2012, [redacted] on April 14, 2012 and [redacted] on May 15, 2013 with remainder of the money due at the completion of both projects. In total I paid BayState [redacted] under the landscaping agreement and the kitchen and garage remodeling agreements. On May 13, 2012 we further modified the kitchen and garage remodeling projects to add additional outlets, insulate exterior walls, move stairs, build new railings and repair exterior wall for a price of [redacted] The total agreed-upon cost of all projects was [redacted] Bay State failed to complete the projects and the work performed was of inferior quality and otherwise not up to specifications. BayState failed to install a floor in the kitchen area and I needed to hire Home Depot to perform the installation. BayState installed a soffit in the kitchen area not up to specifications which needed to be removed in order for the cabinets to fit and for the kitchen window to line up with the bathroom window and to allow for installation of a backsplash. The work was performed incorrectly by BayState and BayState refused to repair the inferior work unless I paid an additional fee of [redacted] to remove and re-install the kitchen window. BayState failed to finish the electrical project and also broke the lights in the hallway of my house. On September 4, 2012, BayState's Ken [redacted] assured me that he would supply a large crew to finish the kitchen and garage remodeling projects on September 17, 2012. Contrary to [redacted]'s representations, BayState did not appear at my house until September 21, 2012 and he appeared with only one other worker. [redacted] then walked off the job and did not finish the project. In total, with respect to the garage and kitchen remodeling projects, Bay State failed to re-install the kitchen window, provide and install baseboards, provide and install countertops, build a new living room wall and complete the plumbing work. With regard to the exterior landscaping project, BayState failed to install downspouts, gutters and to properly grade the soil for proper water run-off and never returned to complete the project.Desired SettlementI am seeking damages equivalent to the cost of repairing of my property and completion of the projects in the amount of [redacted] which is the amount I already have paid or will need to expend to repair my property and complete the projects - [redacted] less the amount BayState would have been due had it completed the two projects to specification - [redacted] I paid [redacted] for flooring materials and [redacted] for floor installation. BayState agreed to credit me [redacted] for the cost of the flooring materials I paid to [redacted] BayState never credited me the flooring materials costs or refunded the flooring installation costs. Bay State failed to install the additional cabinet and the trash bin and never credited or refunded the [redacted] to me. In addition to the [redacted] for flooring materials I paid to [redacted] I also expended [redacted] to [redacted] for a countertop, [redacted] to [redacted] Electrical Services to perform the electrical work and repair the damage caused by BayState at my home, and [redacted] to [redacted] and [redacted] to perform the plumbing work. BayState never credited or refunded these monies to me. I estimate that the cost to finish remodeling the kitchen and the garage by another contractor up to specifications agreed to by me and BayState would be [redacted] As a result of BayState not finishing the landscaping project, I need to expend an additional [redacted] to complete the project up to specifications we agreed on. It total, I estimate that it will cost me additional [redacted] to complete the kitchen and garage remodeling projects and the exterior landscaping projects. I also request reimbursement for the amounts I already paid Home Depot for kitchen flooring and countertops, as well as for plumbing and electrical services. I would like a total reimbursement in the amount of [redacted]Business Response Baystate Homes Corp.[redacted] St [redacted] XXXXX(XXX) XXX-XXXXOctober 22, 2014Revdex.com Case XXXXXXResponse of Baystate Homes CorpPrior to the two contracts in question we successfully completed construction of a 16' x 32' shed under the direction of Mr [redacted]. He was extremely satisfied and very reasonable to work with.At a later date Mr [redacted] called me to his home to review a problem in that water collected around his foundation causing ponding. I showed him that his home existed below street level, his lawn sloped towards his home and a large hill in back drained to the foundation. I showed him that there was virtually nowhere to drain the runoff. I found a low spot approximately 150 ft in the back that would allow approximately 1' pitch which in 150' is next to nothing. This figure was obtained by using a transit. I explained that I could not guarantee no ponding, but at least this excavation would allow for some relief of water build up. At the same time Mr [redacted] asked that I construct a walk of pavers along the front and down the left side of his home. I told him that the best way to construct the walk is to excavate 12" down and add compacted crushed stone. Mr [redacted] said he did not want to spend the money for this construction but wanted the pavers placed on grade. The projects were completed and Mr [redacted] was very pleased so much so that Mrs [redacted] on several occasions brought us baked goods and sausage on several occasions. Mr [redacted], in an Email even invited me to his children's recitals. In the above contracts I dealt exclusively with Mr [redacted].On March 10, 2012 and September 19, 2012 contracts were signed for kitchen remodeling. Contract of 3-10-12 #8 states "construct soffit to hide ceiling pipes" which were existing at the time. This soffit was constructed, window installed and sheetrocking, taping and floating were completed. After looking at this for almost three weeks Mrs [redacted] decided she wanted to change this. I pointed this out as part of the specifications to Mr [redacted] and he said he had to listen to his wife, he had no say. Mr [redacted] said he would hire his own plumber to move pipes in a way to please Mrs [redacted], I warned him that any work by him must be to code, inspected and complete before I would come back and Mr [redacted] tore down the soffit and expected me to construct a new. His plumbing took almost two months as I could not work on the job I went to other jobs. There is no mention in any contract that window is to be aligned with bath window above nor any mention of gutter work.Our contract called for us to move existing kitchen cabinets to the new space. We found that the current cabinets were nailed to the wall instead of screwed as is practice. Cabinets could not be reused without damaging. As a sign of good faith I offered to purchase new cabinets if [redacted] were to only pay $1,000.00 of the cost. Mrs [redacted] agreed and picked out a color and style, then as typical with Mrs [redacted] she cancelled three days later saying she wanted her old cabinets.Flooring- I supplied a quality product sample from my wholesaler of which Mrs [redacted] picked one and I ordered. A few days later Mr [redacted] said his wife had ordered flooring from [redacted]. I canceled my order and cautioned about poor quality product from [redacted]. Another delay was incurred as their delivery was late in arriving and only half was delivered. We were there waiting with nothing to do. Mr [redacted] asked that I pick up the balance of the flooring from the trucking company, which I did. The product was defective and after 1 /2 days we were only able to install approximately 30 sq ft. At that point Mr [redacted] said he had installed laminate floor, I too have installed much of the product, and he found that he could not make it lock together as well. I wasted much time withthe product that he supplied.Mr [redacted] at one point announced to me that he was going to Italy for three weeks and wanted the job stopped until he came home, even though Mrs [redacted] was to stay home. This left me without any planed work to start so I lost one week of work before I could schedule another job. Due to [redacted] delays I was forced to pay dumpster rental fees for three months rather than two weeks. Due to [redacted] constant changes, delays, indecision and supply of his defective materials I feel that I am owed $[redacted]Thank you for your review of this complaint, Ken [redacted], presConsumer Response (The consumer indicated he/she DID NOT accept the response from the business.)I disagree wholly with the business' response with regard to their conduct throughout the kitchen re-modelling and landscaping projects. I deny all allegations made by the business that my conduct led to the business incurring any damages. I request conditionally binding arbitration. Final Business Response I stand by my response

This is an unreliable and untrustworthy contractor. Unsatisfied with his work.
The final inspection from the City of Worcester inspector failed twice due to incomplete
work and defects. Problems created were defined as " small problems" by him.
Miscalculations for the garage's height and its floor caused us to redo whole driveway
with a different slope.
Cracks on the garage's floor.
A leak on the garage's foundation persists even after he claimed to have fixed it.
I would rather hire somebody else more reliable to fix his problems.

This is an unreliable and untrustworthy contractor. Unsatisfied with his work.
The final inspection from the City of Worcester inspector failed twice due to incomplete
work and defects. Problems created were defined as " small problems" by him.
Miscalculations for the garage's height and its floor caused us to redo whole driveway
with a different slope.
Cracks on the garage's floor.
A leak on the garage's foundation persists even after he claimed to have fixed it.
I would rather hire somebody else more reliable to fix his problems.

Contractor was hired to perform a home remodeling project. Work was not performed properly and was not completed, causing losses of [redacted] On February 4, 2012, I retained BayState to landscape and re-grade my property at [redacted] for a price of [redacted] On March 10, 2012, I retained BayState to also remodel my existing garage at my home into a kitchen and to remodel my existing kitchen into a living room for a price of [redacted] On March 28, 2012 we modified the garage remodeling project to add an additional cabinet and trash bin for an additional price of [redacted] On March 28, 2012 I paid BayState [redacted] to begin work on the projects, additional [redacted] on April 13, 2012, [redacted] on April 13, 2012, [redacted] on April 14, 2012 and [redacted] on May 15, 2013 with remainder of the money due at the completion of both projects. In total I paid BayState [redacted] under the landscaping agreement and the kitchen and garage remodeling agreements. On May 13, 2012 we further modified the kitchen and garage remodeling projects to add additional outlets, insulate exterior walls, move stairs, build new railings and repair exterior wall for a price of [redacted] The total agreed-upon cost of all projects was [redacted] Bay State failed to complete the projects and the work performed was of inferior quality and otherwise not up to specifications. BayState failed to install a floor in the kitchen area and I needed to hire Home Depot to perform the installation. BayState installed a soffit in the kitchen area not up to specifications which needed to be removed in order for the cabinets to fit and for the kitchen window to line up with the bathroom window and to allow for installation of a backsplash. The work was performed incorrectly by BayState and BayState refused to repair the inferior work unless I paid an additional fee of [redacted] to remove and re-install the kitchen window. BayState failed to finish the electrical project and also broke the lights in the hallway of my house. On September 4, 2012, BayState's Ken [redacted] assured me that he would supply a large crew to finish the kitchen and garage remodeling projects on September 17, 2012. Contrary to [redacted]'s representations, BayState did not appear at my house until September 21, 2012 and he appeared with only one other worker. [redacted] then walked off the job and did not finish the project. In total, with respect to the garage and kitchen remodeling projects, Bay State failed to re-install the kitchen window, provide and install baseboards, provide and install countertops, build a new living room wall and complete the plumbing work. With regard to the exterior landscaping project, BayState failed to install downspouts, gutters and to properly grade the soil for proper water run-off and never returned to complete the project.Desired SettlementI am seeking damages equivalent to the cost of repairing of my property and completion of the projects in the amount of [redacted] which is the amount I already have paid or will need to expend to repair my property and complete the projects - [redacted] less the amount BayState would have been due had it completed the two projects to specification - [redacted] I paid [redacted] for flooring materials and [redacted] for floor installation. BayState agreed to credit me [redacted] for the cost of the flooring materials I paid to [redacted] BayState never credited me the flooring materials costs or refunded the flooring installation costs. Bay State failed to install the additional cabinet and the trash bin and never credited or refunded the [redacted] to me. In addition to the [redacted] for flooring materials I paid to [redacted] I also expended [redacted] to [redacted] for a countertop, [redacted] to [redacted] Electrical Services to perform the electrical work and repair the damage caused by BayState at my home, and [redacted] to [redacted] and [redacted] to perform the plumbing work. BayState never credited or refunded these monies to me. I estimate that the cost to finish remodeling the kitchen and the garage by another contractor up to specifications agreed to by me and BayState would be [redacted] As a result of BayState not finishing the landscaping project, I need to expend an additional [redacted] to complete the project up to specifications we agreed on. It total, I estimate that it will cost me additional [redacted] to complete the kitchen and garage remodeling projects and the exterior landscaping projects. I also request reimbursement for the amounts I already paid Home Depot for kitchen flooring and countertops, as well as for plumbing and electrical services. I would like a total reimbursement in the amount of [redacted]Business Response Baystate Homes Corp.[redacted] St [redacted] XXXXX(XXX) XXX-XXXXOctober 22, 2014Revdex.com Case XXXXXXResponse of Baystate Homes CorpPrior to the two contracts in question we successfully completed construction of a 16' x 32' shed under the direction of Mr [redacted]. He was extremely satisfied and very reasonable to work with.At a later date Mr [redacted] called me to his home to review a problem in that water collected around his foundation causing ponding. I showed him that his home existed below street level, his lawn sloped towards his home and a large hill in back drained to the foundation. I showed him that there was virtually nowhere to drain the runoff. I found a low spot approximately 150 ft in the back that would allow approximately 1' pitch which in 150' is next to nothing. This figure was obtained by using a transit. I explained that I could not guarantee no ponding, but at least this excavation would allow for some relief of water build up. At the same time Mr [redacted] asked that I construct a walk of pavers along the front and down the left side of his home. I told him that the best way to construct the walk is to excavate 12" down and add compacted crushed stone. Mr [redacted] said he did not want to spend the money for this construction but wanted the pavers placed on grade. The projects were completed and Mr [redacted] was very pleased so much so that Mrs [redacted] on several occasions brought us baked goods and sausage on several occasions. Mr [redacted], in an Email even invited me to his children's recitals. In the above contracts I dealt exclusively with Mr [redacted].On March 10, 2012 and September 19, 2012 contracts were signed for kitchen remodeling. Contract of 3-10-12 #8 states "construct soffit to hide ceiling pipes" which were existing at the time. This soffit was constructed, window installed and sheetrocking, taping and floating were completed. After looking at this for almost three weeks Mrs [redacted] decided she wanted to change this. I pointed this out as part of the specifications to Mr [redacted] and he said he had to listen to his wife, he had no say. Mr [redacted] said he would hire his own plumber to move pipes in a way to please Mrs [redacted], I warned him that any work by him must be to code, inspected and complete before I would come back and Mr [redacted] tore down the soffit and expected me to construct a new. His plumbing took almost two months as I could not work on the job I went to other jobs. There is no mention in any contract that window is to be aligned with bath window above nor any mention of gutter work.Our contract called for us to move existing kitchen cabinets to the new space. We found that the current cabinets were nailed to the wall instead of screwed as is practice. Cabinets could not be reused without damaging. As a sign of good faith I offered to purchase new cabinets if [redacted] were to only pay $1,000.00 of the cost. Mrs [redacted] agreed and picked out a color and style, then as typical with Mrs [redacted] she cancelled three days later saying she wanted her old cabinets.Flooring- I supplied a quality product sample from my wholesaler of which Mrs [redacted] picked one and I ordered. A few days later Mr [redacted] said his wife had ordered flooring from [redacted]. I canceled my order and cautioned about poor quality product from [redacted]. Another delay was incurred as their delivery was late in arriving and only half was delivered. We were there waiting with nothing to do. Mr [redacted] asked that I pick up the balance of the flooring from the trucking company, which I did. The product was defective and after 1 /2 days we were only able to install approximately 30 sq ft. At that point Mr [redacted] said he had installed laminate floor, I too have installed much of the product, and he found that he could not make it lock together as well. I wasted much time withthe product that he supplied.Mr [redacted] at one point announced to me that he was going to Italy for three weeks and wanted the job stopped until he came home, even though Mrs [redacted] was to stay home. This left me without any planed work to start so I lost one week of work before I could schedule another job. Due to [redacted] delays I was forced to pay dumpster rental fees for three months rather than two weeks. Due to [redacted] constant changes, delays, indecision and supply of his defective materials I feel that I am owed $[redacted]Thank you for your review of this complaint, Ken [redacted], presConsumer Response (The consumer indicated he/she DID NOT accept the response from the business.)I disagree wholly with the business' response with regard to their conduct throughout the kitchen re-modelling and landscaping projects. I deny all allegations made by the business that my conduct led to the business incurring any damages. I request conditionally binding arbitration. Final Business Response I stand by my response

Check fields!

Write a review of Baystate Homes Corporation

Satisfaction rating
 
 
 
 
 
Upload here Increase visibility and credibility of your review by
adding a photo
Submit your review

Baystate Homes Corporation Rating

Overall satisfaction rating

Description: Construction & Remodeling Services, Buildings - Pre - Cut, Prefab & Modular - Dealers, Modular Homes, Home Improvements- Additions, Windows & Doors - Installation & Service, Patio Builder, Kitchen Remodeling, Kitchen Cabinets & Equipment-Household, Home B

Address: 65 Howard St, Paxton, Massachusetts, United States, 01612-1570

Phone:

Show more...

Web:

This website was reported to be associated with Baystate Homes Corporation.



Add contact information for Baystate Homes Corporation

Add new contacts
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | New | Updated