Renovation Innovations contracted to do home renovationsJob to take 8-weeksYear later still not done and liens on our home
In March/my*** and I contracted with Renovation Innovations (*** ***) to do some renovations on our home***
It is May/and the work is still far from doneThe contractor does not reply to calls or emailsWe have two liens our on house because he failed to pay subcontractors (though we paid him funds to do so)Contractor refuses to take steps to remove these liens
Contractor took a new $*** downdraft from us without compensating us*** he left us with stained carpeting (which we warned him against in advance)The kitchen countertops installed were measured incorrectly by himWe had a several leak issues ***
Mr*** has refused to communicate with usHis silence and inaction is holding up mort
We hired TAM HAMPSON 20/Design (Renovation Innovations Inc is the name on their work vehicles) in February of to design and build our house
In March of we were contacted by the heating company we were using and they were claiming a lien on our property for work that had been done but not paid forWe paid the builder, but our money was not applied to our accountIn April of the lien was filed on our propertyWe were forced to settle the lien ourselves and incur the legal costs ourselves
In June of we called the city regarding inspections and were informed that a stop work order had been placed on our property on June 15, for unresolved issues dating back to failed inspections from June
Renovation Innovations contracted to do home renovationsJob to take 8-weeksYear later still not done and liens on our home
In March/my*** and I contracted with Renovation Innovations (*** ***) to do some renovations on our home***
It is May/and the work is still far from doneThe contractor does not reply to calls or emailsWe have two liens our on house because he failed to pay subcontractors (though we paid him funds to do so)Contractor refuses to take steps to remove these liens
Contractor took a new $*** downdraft from us without compensating us*** he left us with stained carpeting (which we warned him against in advance)The kitchen countertops installed were measured incorrectly by himWe had a several leak issues ***
Mr*** has refused to communicate with usHis silence and inaction is holding up mort
We hired TAM HAMPSON 20/Design (Renovation Innovations Inc is the name on their work vehicles) in February of to design and build our house
In March of we were contacted by the heating company we were using and they were claiming a lien on our property for work that had been done but not paid forWe paid the builder, but our money was not applied to our accountIn April of the lien was filed on our propertyWe were forced to settle the lien ourselves and incur the legal costs ourselves
In June of we called the city regarding inspections and were informed that a stop work order had been placed on our property on June 15, for unresolved issues dating back to failed inspections from June