Sign in

Clean Cut Management Company

Sharing is caring! Have something to share about Clean Cut Management Company? Use RevDex to write a review
Reviews Clean Cut Management Company

Clean Cut Management Company Reviews (9)

I am sending you copies of the same information I sent to Ms [redacted] lawyer back in May Todate I have not heard anything from Ms [redacted] or the lawyerThis is all the information I have on this matter.If you need any other information, feel free to give me a call or emailThank you and have a nice day, [redacted] ***

ID # [redacted] Mize General Contracting LLC Waters Edge Dr.Newark DE [redacted] I have attached all correspondence with Ms [redacted] We compiled the proposal that Ms [redacted] agreed onWe also sent a second proposal for work that would be needed to be done It is an older home and its needs quite a bit of work.We would be more than happy to complete the additional repairs needed to be done but the will be an additional charged.I would like this matter to be resolved with all parties happyWe take great pride in our work and would like our customers to be happy with the outcome of their repair.I hope we can come to an understated with Mr [redacted] because we would like her to be happy with our work and I hope you can help resolve this matter.Thank you for your time [redacted] Mize General Contracting

Revdex.com: I have reviewed the response made by the business in reference to complaint ID [redacted] , and have determined that this does not resolve my complaint For your reference, details of the offer I reviewed appear below There was no verbal agreement to make any payments on a monthly basis The proposal was $on the original proposal of the roof only, for would be paid upon accomplishment( [redacted] did not give you a copy 0f the first proposal for just the roof, which give more detail to work on the roof to be done)Their second proposal included partial of the first contract However, I paid the amount they ask for, believing the work would have been done in a timely mannerTheir first proposal was my second proposalThe proposal shows the agreement was due upon completion Every proposal agreed to had a deposit and the balance was due at completion The additional work has nothing to do these problems, I am disputing, it is everything to do with the work I already paid that was not done as promised What makes the [redacted] think I would add another contract and they have not completed the job as promised As stated in my complaint to the Revdex.comI have the picture to show the work was not in a professional mannerThe work that was completed, a handy man could have done much better job When I saw the condition of the roof, [redacted] assured me that he could do the repairs and it comes with 5- year warranty ( [redacted] took pictures showing the condition of the roof)He explains that I would not have any problems with the roof he has been in this business for so many years This is the second proposal Seal leaks and flashing with cement and fabricApply aluminum roof coating to upper and lower roofGalvanized cap and box off chimney and install modified burethane roofing material, grind and repoint back chimney wall areaRemove existing rotten fascia board and metal Replace fascia and metal also install new Kseamless gutterTie downspout into existing street drain, He revised the contract to add the repointing back chimney and increased the deposit from $and requested $deposit, because of the additional workI made the deposits and balance was to be paid upon completion, see contract On Tuesday 11/24/at 9:AM, sent text message, because I didn't get return callsfrom ***In the text, GmWhere you able to finish the job as plan (roof)and what was the estimate for pointing back windows and the cornerPlease adviseLater that afternoon went down to see contractor, I thought he would be completing the top and bottom roofHe left the lower roof exposed and a piece of aluminum hanging over the fence with long nail sticking outLooking out of the 2nd and 3rd floor windows no repairs to roof or coating material covering the roofIt appeared that no work was being done I did not check the upper roof [redacted] agreed to send pictures as he completed the processI was told he does that for all his customers There is a playground across the street and I see children playing across the streetI was so upset that one of those children could have hurt themselves Fascia board was left expose and water could cause some molding when it rained That is one of the reason I call the credit card companyYes, they credit my account for the $After I had another contractor come out give another free estimate, I was told that someone appeared to be working on the upper roof I was surprise, I apologized having come outSo I called my credit card company and explain that I wanted to give [redacted] a chance to finish the[JP1] work he started I still want [redacted] to fix my downspout he cut holds into to add a short piece to downspout from the lower roof to the old downspout, which has cause leaks into my basementThe wrong type of nails was used to anchor the loose downspoutThe ridged cuts on the downspout not sealed and you can cut yourself One of many promises 03/15/said he would fix the downspout when gets back in townAs of 04/16/and until this day, I called and text so many times with no resultsThe water leaks in my basement when it rains, because the downspout push into the main drain incorrectly The bathroom on the 3rd floor leaking water from the pipe collars on the roofI was told it would be sealed In addition, water on the 3rd floor back room, leaking from water coming through the roof into the ceilingThe pointing was place on the back wall to prevent any moisture coming through the wall has fallen off in most placesIt was not smooth out [redacted] left cement all over my window and window sealMy neighbor property had cement all on property, very upset never seen such slopping and unprofessional workShe called the company, but she had someone to clean it up Chimney looks about the same, no close up pictures to determined, if anything was doneThis is not my profession, that is why I called for some professional guidance [redacted] said he was the man for the jobI had other appointment from Home Advisors [redacted] was the first from the company showed up ( [redacted] General Contractor/ ***- or whoever was working for him) How soon would the company make all repairs and prime the ceilings caused by the leaksSee my original request [JP1]

I am sending you copies of the same information I sent to Ms*** lawyer back in May Todate I have not heard anything from Ms*** or the lawyerThis is all the information I have on this matter.If you need any other information, feel free to give me a call or emailThank you and have a nice day,*** ***

ID #***Mize General Contracting LLC Waters Edge Dr.Newark DE *** *** ***I have attached all correspondence with Ms ***We compiled the proposal that Ms*** *** agreed onWe also sent a second proposal for work that would be needed to be done
It is an older home and its needs quite a bit of work.We would be more than happy to complete the additional repairs needed to be done but the will be an additional charged.I would like this matter to be resolved with all parties happyWe take great pride in our work and would like our customers to be happy with the outcome of their repair.I hope we can come to an understated with Mr*** because we would like her to be happy with our work and I hope you can help resolve this matter.Thank you for your time*** ***Mize General Contracting

I am sending you copies of the same information I sent to Ms*** lawyer back in May Todate I have not heard anything from Ms*** or the lawyerThis is all the information I have on this matter.If you need any other information, feel free to give me a call or emailThank you and have a nice day,*** ***

Revdex.com:
I have reviewed the response made by the business in reference to complaint ID ***, and have determined that this does not resolve my complaint.? For your reference, details of the offer I reviewed appear below
?
There was no verbal agreement to make any payments on a monthly basis
The proposal was $on the original proposal of the roof only, for
would be paid upon accomplishment(*** did not give you a copy 0f the first
proposal for just the roof, which give more detail to work on the roof to be
done)Their second proposal included partial of the first contract? However, I paid the amount they ask for,
believing the work would have been done in a timely mannerTheir first proposal
was my second proposalThe proposal shows the agreement was due upon completion
Every proposal agreed to had a deposit and the balance was due at completion
The additional work has nothing to do these problems, I am disputing,
it is everything to do with the work I already paid that was not done as promised
What makes the *** *** think I would add another contract and they have not
completed the job as promised? As stated
in my complaint to the Revdex.comI have the picture to show the work was not in a
professional mannerThe work that was completed, a handy man could have done
much better job
When I saw the condition of the roof, *** assured me that he could do
the repairs and it comes with 5- year warranty.?
(*** took pictures showing the condition of the roof)He explains
that I would not have any problems with the roof he has been in this business
for so many years
This is the second proposal Seal leaks and flashing with cement and
fabricApply aluminum roof coating to upper and lower roofGalvanized cap and
box off chimney and install modified burethane roofing material, grind and
repoint back chimney wall areaRemove existing rotten fascia board and metal
Replace fascia and metal also install new Kseamless gutterTie downspout
into existing street drain, He revised the contract to add the repointing back
chimney and increased the deposit from $and requested $deposit,
because of the additional workI made the deposits and balance was to be paid
upon completion, see contract.?
On Tuesday 11/24/at 9:AM, sent text message, because I didn't
get return callsfrom ***In the text, GmWhere you able to finish the job
as plan (roof)and what was the estimate for pointing back windows and the
cornerPlease adviseLater that afternoon went down to see contractor, I
thought he would be completing the top and bottom roofHe left the lower roof
exposed and a piece of aluminum hanging over the fence with long nail sticking
outLooking out of the 2nd and 3rd floor windows no repairs to roof
or coating material covering the roofIt appeared that no work was being done
? I did not check the upper roof*
agreed to send pictures as he completed the processI was told he does that
for all his customers? ?
There is a playground across the street and I see children playing across
the streetI was so upset that one of those children could have hurt themselves.? Fascia board was left expose and water could
cause some molding when it rained
That is one of the reason I call the credit card companyYes, they
credit my account for the $After I had another contractor come out give
another free estimate, I was told that someone appeared to be working on the
upper roof? I was surprise, I apologized
having come outSo I called my credit card company and explain that I wanted
to give *** a chance to finish the[JP1] work he started
I still want *** to fix my downspout he cut holds into to add a short
piece to downspout from the lower roof to the old downspout, which has cause
leaks into my basementThe wrong type of nails was used to anchor the loose
downspoutThe ridged cuts on the downspout not sealed and you can cut yourself
One of many promises 03/15/said he would fix the downspout when gets
back in townAs of 04/16/and until this day, I called and text so many
times with no resultsThe water leaks in my basement when it rains, because
the downspout push into the main drain incorrectly
? The bathroom on the 3rd
floor leaking water from the pipe collars on the roofI was told it would be sealed
In addition, water on the 3rd floor back room, leaking from water
coming through the roof into the ceilingThe pointing was place on the back
wall to prevent any moisture coming through the wall has fallen off in most
placesIt was not smooth out*** left cement all over my window and window
sealMy neighbor property had cement all on property, very upset never seen
such slopping and unprofessional workShe called the company, but she had
someone to clean it up.? Chimney looks about
the same, no close up pictures to determined, if anything was doneThis is not
my profession, that is why I called for some professional guidance*** said
he was the man for the jobI had other appointment from Home Advisors *** was
the first from the company showed up
(*** *** General Contractor/ ***- or whoever was working for him)
How soon would the company make all repairs and prime the ceilings
caused by the leaksSee my original request
[JP1]

ID #[redacted]Mize General Contracting LLC 2206 Waters Edge Dr.Newark DE 19702 [redacted]I have attached all correspondence with Ms.  [redacted]. We compiled the proposal that Ms. [redacted] agreed on. We also sent a second proposal for work that would be needed to be done....

It is an older home and its needs quite a bit of work.We would be more than happy to complete the additional repairs needed to be done but the will be an additional charged.I would like this matter to be resolved with all parties happy. We take great pride in our work and would like our customers to be happy with the outcome of their repair.I hope we can come to an understated with Mr. [redacted] because we would like her to be happy with our work and I hope you can help resolve this matter.Thank you for your time. [redacted]Mize General Contracting

Revdex.com:
I have reviewed the response made by the business in reference to complaint ID [redacted], and have determined that this does not resolve my complaint.  For your reference, details of the offer I reviewed appear below.
 
There was no verbal agreement to make any payments on a monthly basis.
The proposal was $100.00 on the original proposal of the roof only, for 850.00
would be paid upon accomplishment. ([redacted] did not give you a copy 0f the first
proposal for just the roof, which give more detail to work on the roof to be
done). Their second proposal included partial of the first contract.  However, I paid the amount they ask for,
believing the work would have been done in a timely manner. Their first proposal
was my second proposal. The proposal shows the agreement was due upon completion.
Every proposal agreed to had a deposit and the balance was due at completion.
The additional work has nothing to do these problems, I am disputing,
it is everything to do with the work I already paid that was not done as promised.
What makes the [redacted] think I would add another contract and they have not
completed the job as promised.  As stated
in my complaint to the Revdex.com. I have the picture to show the work was not in a
professional manner. The work that was completed, a handy man could have done
much better job.
When I saw the condition of the roof, [redacted] assured me that he could do
the repairs and it comes with 5- year warranty. 
([redacted] took pictures showing the condition of the roof). He explains
that I would not have any problems with the roof he has been in this business
for so many years.
This is the second proposal Seal leaks and flashing with cement and
fabric. Apply aluminum roof coating to upper and lower roof. Galvanized cap and
box off chimney and install modified burethane roofing material, grind and
repoint back chimney wall area. Remove existing rotten fascia board and metal.
Replace fascia and metal also install new K5 seamless gutter. Tie downspout
into existing street drain, He revised the contract to add the repointing back
chimney and increased the deposit from $100.00 and requested $400.00 deposit,
because of the additional work. I made the deposits and balance was to be paid
upon completion, see contract. 
On Tuesday 11/24/2015 at 9:20 AM, sent text message, because I didn't
get return calls. from [redacted]. In the text, Gm. Where you able to finish the job
as plan (roof)and what was the estimate for pointing back windows and the
corner. Please advise. Later that afternoon went down to see contractor, I
thought he would be completing the top and bottom roof. He left the lower roof
exposed and a piece of aluminum hanging over the fence with long nail sticking
out. Looking out of the 2nd and 3rd floor windows no repairs to roof
or coating material covering the roof. It appeared that no work was being done.
 I did not check the upper roof. [redacted]
agreed to send pictures as he completed the process. I was told he does that
for all his customers.   
There is a playground across the street and I see children playing across
the street. I was so upset that one of those children could have hurt themselves.  Fascia board was left expose and water could
cause some molding when it rained.
That is one of the reason I call the credit card company. Yes, they
credit my account for the $100.00. After I had another contractor come out give
another free estimate, I was told that someone appeared to be working on the
upper roof.  I was surprise, I apologized
having come out. So I called my credit card company and explain that I wanted
to give [redacted] a chance to finish the[JP1] work he started.
I still want [redacted] to fix my downspout he cut holds into to add a short
piece to downspout from the lower roof to the old downspout, which has cause
leaks into my basement. The wrong type of nails was used to anchor the loose
downspout. The ridged cuts on the downspout not sealed and you can cut yourself.
One of many promises 03/15/16 said he would fix the downspout when gets
back in town. As of 04/16/16 and until this day, I called and text so many
times with no results. The water leaks in my basement when it rains, because
the downspout push into the main drain incorrectly.
 The bathroom on the 3rd
floor leaking water from the pipe collars on the roof. I was told it would be sealed.
In addition, water on the 3rd floor back room, leaking from water
coming through the roof into the ceiling. The pointing was place on the back
wall to prevent any moisture coming through the wall has fallen off in most
places. It was not smooth out. [redacted] left cement all over my window and window
seal. My neighbor property had cement all on property, very upset never seen
such slopping and unprofessional work. She called the company, but she had
someone to clean it up.  Chimney looks about
the same, no close up pictures to determined, if anything was done. This is not
my profession, that is why I called for some professional guidance. [redacted] said
he was the man for the job. I had other appointment from Home Advisors [redacted] was
the first from the company showed up.
([redacted] General Contractor/ [redacted]- or whoever was working for him)
How soon would the company make all repairs and prime the ceilings
caused by the leaks. See my original request.
[JP1]

Check fields!

Write a review of Clean Cut Management Company

Satisfaction rating
 
 
 
 
 
Upload here Increase visibility and credibility of your review by
adding a photo
Submit your review

Clean Cut Management Company Rating

Overall satisfaction rating

Address: Detroit, Michigan, United States, 48227-3789

Phone:

Show more...

Add contact information for Clean Cut Management Company

Add new contacts
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | New | Updated