Our new home arrived at our lot in December 2022. As the contractor, Carolina Custom Homes ("CCH") worked, we noted to the site manager ("Mngr") that the oak staircase handrail had crooked vertical spindles. The Mngr agreed and notified CCH. We were soon advised that the manufacturer would send a rep to replace the handrail. That was 9 months ago.
Around the same time, we began finding problems with the upgraded, higher-cost kitchen cabinets. CCH's sub tried to fix the problems but was mostly unsuccessful. CCH's Mngr said the manufacturer would also send a cabinet person to repair or replace the problems. In September, we asked when the manufacturer would send these repair people and were advised that 2 work orders had been issued. Although we've asked when the reps would do the work, we've gotten no commitment as to time.
Upon submitting our 30-day list to CCH in October 2023, some of the broken, misfitting, or wrongly installed faults we found with the manufacturer are:
a) The staircase rail mentioned above.
b) Approximately 40+ problems with cabinets in the kitchen and utility room. These include top and bottom cabinets hung out of line with each other, a bottom falling out of a drawer, a drawer which doesn't work at all, undersized doors in cabinets so that the contents are visible from outside, soft-close drawers hung at strange heights, wasting space and/or making the drawers unusable, an out-of-level and unstable cabinet with a fall hazard, doors that don't close properly, drawers that don't soft-close properly, etc.
c) A broken corner on our front door.
d) Undersized doors between the master bathroom and bedroom, so that with the doors fully closed one can see into the next room.
This is just a sample of the issues with the manufacturer's installations which, 8-9 months later, have still not been addressed by a promised representative. It should be noted that there are other problems on our 30-day list which CCH may assign as R-Anell's responsibility (e.g., 3 misfitting windows).
Around the same time, we began finding problems with the upgraded, higher-cost kitchen cabinets. CCH's sub tried to fix the problems but was mostly unsuccessful. CCH's Mngr said the manufacturer would also send a cabinet person to repair or replace the problems. In September, we asked when the manufacturer would send these repair people and were advised that 2 work orders had been issued. Although we've asked when the reps would do the work, we've gotten no commitment as to time.
Upon submitting our 30-day list to CCH in October 2023, some of the broken, misfitting, or wrongly installed faults we found with the manufacturer are:
a) The staircase rail mentioned above.
b) Approximately 40+ problems with cabinets in the kitchen and utility room. These include top and bottom cabinets hung out of line with each other, a bottom falling out of a drawer, a drawer which doesn't work at all, undersized doors in cabinets so that the contents are visible from outside, soft-close drawers hung at strange heights, wasting space and/or making the drawers unusable, an out-of-level and unstable cabinet with a fall hazard, doors that don't close properly, drawers that don't soft-close properly, etc.
c) A broken corner on our front door.
d) Undersized doors between the master bathroom and bedroom, so that with the doors fully closed one can see into the next room.
This is just a sample of the issues with the manufacturer's installations which, 8-9 months later, have still not been addressed by a promised representative. It should be noted that there are other problems on our 30-day list which CCH may assign as R-Anell's responsibility (e.g., 3 misfitting windows).