Signed a contract to have a sunroom built in April and the job is not yet complete (a trim piece is missing that covers wiring and there are no steps leading from the doorwalls to the outside) The contractor apparently ran out of money, which substantially delayed the project and required that I directly pay for the subcontractors and building supplies The workers installing the sunroom were not properly trained and/or lacked basic knowledge in construction, resulting in the walls not being plumb or level There is water leaking into the sunroom at one of the doorwalls, possibly because of the wall is not plumb and the door cannot close properly The gutters were not installed properly, with no endcaps where the gutters meet the wood facia of the house, and the downspouts were also not installed properly, causing water leaks There are a number of holes in the various door frames because the door latch was installed incorrectly (upside down), as well as other holes because
Signed a contract to have a sunroom built in April and the job is not yet complete (a trim piece is missing that covers wiring and there are no steps leading from the doorwalls to the outside) The contractor apparently ran out of money, which substantially delayed the project and required that I directly pay for the subcontractors and building supplies The workers installing the sunroom were not properly trained and/or lacked basic knowledge in construction, resulting in the walls not being plumb or level There is water leaking into the sunroom at one of the doorwalls, possibly because of the wall is not plumb and the door cannot close properly The gutters were not installed properly, with no endcaps where the gutters meet the wood facia of the house, and the downspouts were also not installed properly, causing water leaks There are a number of holes in the various door frames because the door latch was installed incorrectly (upside down), as well as other holes because