On 04/23/14, I, Kenneth ACurtis Concrete Construction, and Mr& Mrs*** [redacted] entered into a signed contract to remove and replace the existing concrete patio, walkway and stepsThe work to be done was for the above listed address On Monday, 4/28/14, my crew and I came to your home and began the agreed upon workOn Friday, 5/2/and Saturday, 5/3/14, my crew installed the concrete patio, walkway, steps and curbingOn this same Saturday, I personally told you I would return on Monday, 5/5/14, to complete the balance of the contracted work, to which you agreedYou made no mention of any aspects of my work you were not happy withAt one point on Saturday, your wife commented to my crew and me, "It looks beautiful!" On Sunday, 5/4/at approximately 9:42am, I received a telephone voicemail message from youYou told me not to return to your home saying you wanted to bring another contractor in to "try to repair some of the damage" my crew causedYou did not specify what any of the damages were Whatever it is that you feel is incorrect, I would like to be informed and given a chance to correct ittake great pride in my work product and as you know, I maintain a AAA rating with the Revdex.com I look forward to hearing back from you soon and bringing the best resolution to all parties involved Sincerely, Kenneth RCurtis

TO WHOM IT MAY CONCERNON 10/3/KENNETH RCURTIS CONCRETE CONSTINTERED INTO A CONTRACT WITH MR & MRS [redacted] TO INSTALL BLOCK RETWALL FTHIGH THE WALL WAS TO BE VEENERD WITH STONE SUPPLYED BY [redacted] ALSO THE TOP OF THE WALL WAS TO HAVE A STONE CAP [redacted] DESIDED TO HAVE THE WALL STUCCO & CAP WITH A DOUBLE CANTILEVER CAP WITH DARK BROWN COLOR [redacted] BROUGHT THE CANTILEVER FORMS BROUGHT THEM HOME AND TOLE [redacted] MY FOREMAN TO INSTALL THEM, [redacted] TOLE [redacted] HE HAD TO GET THE OK FORM KEN [redacted] TOLL [redacted] HE WAS THE OWNER & BOSS AND THE ONE PAYING FOR THE WORK SO [redacted] SAID TO [redacted] OK HE PUT THEM ON [redacted] TOLE ME WHEN HE SIGNED THE CONTRACT THAT THEIR WOULD BE SOME CHANGED AND ADDITIONS BUT HE WOULD PAY FOR THEM [redacted] TOLE ME THAT HIS DAUGHTER WAS GOING TO HAVE HER 16TH BIRTHDAY AND THEY HAVE A LOT OF PEOPLE COMING FOR THE PARTY AND HE NEEDED THE CONCRETE INSTALLED WE GOT THE CONCRETE DONE ABOUT MIDNIGHT AND THAT MADE HIM HAPPYEVEN THOUGH I HAD TO BRING IN TWO MORE FINISHER FOR THE SCORING OF THE CONCRETEMRS [redacted] WANTED THE SCORING DONE WITH A JOINTER INSTED OF SAW CUTTING THEM LIKE THE REST OF THEIR JOINTING THEIR OTHER CONCRETE.THE EXTRAS THAT [redacted] ADDED WERE THE WALL ALONG THE POOL DECK & PLWALL IN BACKWALL AROUND BENCH AT THE FIRE PITWALL ALONG SLAB AT THE FIRE PITWALL IN PLANTER AREA BETWEEN STEPS AT FIREPIT AREASETS OF DRAIN SYSTEMSINSTALLING LIGHTS IN STEPS & PILASTERS (LABOR ONLY)LOADS OF DIRT I HAD INSTALL FROM OTHER JOB SITEINSTALLING CANTILEVER CAPS ON ALL THE WALLS

Revdex.com: I have reviewed the response made by the business in reference to complaint ID [redacted] , and have determined that this proposed action would not resolve my complaint For your reference, details of the offer I reviewed appear below MrCurtis has lost a claim against his bond insurancethe state of CAHas been notified and will notify him to suspend his licence because of breach of contractUnless he corrects his issues with the bond compThe insurance bond company and the state contractors board has found enough evidence to justify my claim actionNow to answer MeCurtis, yes there were changes I made...and yes there was a final amended contract by both Mr Curtis and iYes we both agreed on a final cost of projectIt was after that MrCurtis said he needed more money...$10K more moneyhe told me he needed to pay his guysAlso, as a contractor you should know that you don't start pouring concrete at pmThe workers did work late and it was till pm not midnightThey also started late because MrCurtis failed to appropriately coordinate materials,workers,and cementThe workers sat at my house for hours before concrete arrivedAnd yes I did have a party planned, but MrCurtis had over a month to complete the concrete....he routinely had one worker here and rarely had materials available for him to do stuffThat's the reason why I had to buy material that was never compensated forThe workers also did a hurry up job, forgetting critical steps and items on the plansRuined my pool coping by pouring up against pool with no expansion jointsThis was proven to be incorrect by industry experts,state contractors board, an bond companyI did tell his workers that I was the boss because they were cutting corners and doing incorrect thingsThe best part is that they did not know I spoke Spanish after I corrected and heard all their complaining on Mr curtis, pay, materials,and my ability to correct their workMrCurtis had a written contract with me for color concrete...he then tells me the color is extra and not included in the contract ....he only wrote color concrete because that's what it's called....not because it's part of the bid [redacted] ...MrCurtis also call me months after he abandoned the job site and wanted to finish the jobThis was only after he was notified by his bond company and state contractors board as of failure to perform a job and penalty of paymentMrCurtis told me on the phone.." hi [redacted] , I didn't know you had paid so much money....I'd like to come back and finish the job.." Really? Because you didn't keep accounting of the checked cashed by you.? This was an example of his lyingMrCurtis had plenty of opportunities to correct his work, he failed to do so and did a bad job, even though he admitted he did not do what was rightI'm not looking for free work, I was just looking for him to do what I paid him to domonths later my work is still not compete and I have to hire someone else to correct and finish his mistakes and insurance company , state license board, and three independent contractors agree with me...I would not ever rate MRCurtis at a high ratingHe turned to be a fraud, liar, and tried to lie his way so you won't change your ratingAnyone wanting to contact me for details I will be happy to answer any questions and send pictures of his poor job Regards, [redacted]

Revdex.com: I have reviewed the response made by the business in reference to complaint ID [redacted] , and have determined that this proposed action would not resolve my complaint For your reference, details of the offer I reviewed appear below The total Sq.-ftof concrete patio slab and steps poured and stamped by Contractor Kenneth R Curtis Concrete Construction is a total unrepairable disasterWhich can not be repaired, do to safety and code violations (see Deputy Concrete Inspectors Report) Contactor, employed a work crew of unskilled, unsupervised temporary labors, whom were openly complaining of being over worked and not paidWorkers exhibited poor workmanship and were not concerned about protecting home owners property against damages(as showed in pictures and stated in Deputy Concrete Inspectors Report sent too, and received by ContractorCertified mail signed by 5-10-14) Contractor Kenneth R Curtis is aware of property damages and code violationsContractor is also aware that the entire patio slab will have to be demolished and replaced The cost for replacing and repairing all concrete and property damages is estimated at $25, Home Owner has already and continues to extend an open invention to Contractor Kenneth R Curtis Concrete Construction, to have a mutually approved Concrete certified Inspector of his choice visit and inspect his work at my home Regards, [redacted] ***

Revdex.com: I have reviewed the response made by the business in reference to complaint ID [redacted] , and have determined that this proposed action would not resolve my complaint For your reference, details of the offer I reviewed appear below Regards, [redacted] Ken had every opportunity to come back and finish the job contracted to doKen contacted me only after his bond insurance company and the state contractors board communicated with him.( that was almost months after he abandoned job)i did receive a call from ken and I did tell him that I did not want any workers at my house if I wasn't there to supervise their workOn that same day he called, his insurance company and the state contractors board also called to inform me that they both had completed their investigation and found sufficient evidence of the poor work, violation/ breech of contract and work not completed to industry standards.Ken agreed to any change and cost of the work doneHe himself listed an itemized list and cost associated with the changesIt was after he was paid that he tried to tell me he wanted an additional $10,to finish the jobi asked him what that cost was and to let me see his new chargeshe gave me a list of the same items just more money attached to ithe agreed on any changes and cost, then tried to tell me that I changed thingsThe SCB found evidence of his breech of contract, I simply wanted to have him finish what he was paid for, and that did not happenHis bond insurance also found evidence of his poor work and judgement went to mei now have to find another person to complete and redo his jobKen also stated he didn't charge me for dirt and walls.....I have the contract amendment that he wrote that says he did"moving dirt......$400.00, total wall construction including capscharges listed on contract (im at work and not at home to verify the correct amount), drains...$900.00, electrical work $150.00," and so on This man can not get his facts straightKen makes no mention of the fact that his workers used my building materials that I had on my property from a previous job because Ken would not deliver materials to work with on a timely matterKen also fails to mention that his workers did not know I speak spanishi could hear them speaking about how they can just " not do it that way because its cost too much for Kenor when asked about mistakes or problems they would talk to themselves and the foreman Pace, and say " they forgot to do it"I will be continuing legal matter against him and his companyHe will be receiving a small claims court case hearing dateAccording to the bond insurance company and state contractors board, I have sufficient evidence that Ken Curtis abandoned the job, failed to comply with industry standards, and had every opportunity to correct his work and complete the work paid for Also, I have a voice message from Ken Apologizing on his behavior and telling me he was at faultKen Curtis Construction still did not return to complete the job after I agreed to have him come backAnyone wanting to hire MRCurtis, I advise you to contact me and I can show you the work and problemsMrCurtis just want to make sure his Revdex.com rating stays goodIf Ken wants to finish his job at no additional cost...(because he called once and said he would finish the job only for an additional $10,000---even though he was paid in full) he can

Revdex.com:
I have reviewed the response made by the business in reference to complaint ID ***,
Kenneth Curtis is "Mind Screwing" you all at the Revdex.com. His offer are vague and insincere Read my response
A building inspector and even the concrete vendorSite Poor workman ship!! A pressure wash is not going to help
Let him keep his A+ rating, so he could screw some other unsuspecting dumb as, with your help
Regards,
*** ***

TO WHOM IT MAY CONCERNI KENNETH RCURTIS, CALLED *** *** TO GET PERMISSION AND TO SET A TIME TO COME TO HIS HOME AND FINISH THE WORK AND DO ANY REPAIRS THAT WERE TO BE DONE*** AGREED ON THE TIME TO COME BACK TO HIS HOME, AND THEN CALLED BOTH TIMES AND CANCELLED.IT IS VERY HARD TO DO THE WORK AND THE REPAIRS IF I AND MY CREW CAN NOT COME ON THE PROPERTIEI HAD MY CREW INSTALL BLOCK WALLS AND DRAW SYSTEM THAT WERE OKED BY *** *** AND HIS WIFE, WITCH WERE NOT A PART OF THE CONTRACTI ALSO BROUGHT LOADS OF DIRT FROM OTHER JOBS, WE WERE DOING SO WE COULD BUILED UP THE YARD FOR THE STEPS THAT WERE ON THE PLANS AND DID NOT CHARGE ***FOR THE DIRT OR LABORTO INSTALL THE DIRT

There are no questions to answer. Do you want me to respond that the case is closed? The case is closed! The customer settled with the bond company. We are in good standing with the contractors board & the bonding company.Kenneth R CurtisOwner of Kenneth R Curtis Concrete Construction

TO WHOM IT MAY CONCERN
I KENNETH RCURTIS, CALLED *** *** TO GET PERMISSION AND TO SET A TIME TO COME TO HIS HOME AND FINISH THE WORK AND DO ANY REPAIRS THAT WERE TO BE DONE*** AGREED ON THE TIME TO COME BACK TO HIS HOME, AND THEN CALLED BOTH TIMES AND CANCELLEDIT IS VERY HARD TO DO THE WORK AND THE REPAIRS IF I AND MY CREW CAN NOT COME ON THE PROPERTIEI HAD MY CREW INSTALL BLOCK WALLS AND DRAW SYSTEM THAT WERE OKED BY *** *** AND HIS WIFE, WITCH WERE NOT A PART OF THE CONTRACTI ALSO BROUGHT LOADS OF DIRT FROM OTHER JOBS, WE WERE DOING SO WE COULD BUILED UP THE YARD FOR THE STEPS THAT WERE ON THE PLANS AND DID NOT CHARGE ***FOR THE DIRT OR LABORTO INSTALL THE DIRT

Revdex.com:
I have reviewed the response made by the business in reference to complaint ID ***, and have determined that this proposed action would not resolve my complaint. For your reference, details of the offer I reviewed appear below
Regards,
*** ***
Ken had every opportunity to come back and finish the job contracted to doKen contacted me only after his bond insurance company and the state contractors board communicated with him.( that was almost months after he abandoned job)i did receive a call from ken and I did tell him that I did not want any workers at my house if I wasn't there to supervise their workOn that same day he called, his insurance company and the state contractors board also called to inform me that they both had completed their investigation and found sufficient evidence of the poor work, violation/ breech of contract and work not completed to industry standardsKen agreed to any change and cost of the work doneHe himself listed an itemized list and cost associated with the changesIt was after he was paid that he tried to tell me he wanted an additional $10,to finish the jobi asked him what that cost was and to let me see his new chargeshe gave me a list of the same items just more money attached to ithe agreed on any changes and cost, then tried to tell me that I changed things
The SCB found evidence of his breech of contract, I simply wanted to have him finish what he was paid for, and that did not happenHis bond insurance also found evidence of his poor work and judgement went to mei now have to find another person to complete and redo his jobKen also stated he didn't charge me for dirt and walls.....I have the contract amendment that he wrote that says he did"moving dirt......$400.00, total wall construction including capscharges listed on contract (im at work and not at home to verify the correct amount), drains...$900.00, electrical work $150.00," and so on ....... This man can not get his facts straightKen makes no mention of the fact that his workers used my building materials that I had on my property from a previous job because Ken would not deliver materials to work with on a timely matterKen also fails to mention that his workers did not know I speak spanishi could hear them speaking about how they can just " not do it that way because its cost too much for Kenor when asked about mistakes or problems they would talk to themselves and the foreman Pace, and say " they forgot to do it"
I will be continuing legal matter against him and his companyHe will be receiving a small claims court case hearing dateAccording to the bond insurance company and state contractors board, I have sufficient evidence that Ken Curtis abandoned the job, failed to comply with industry standards, and had every opportunity to correct his work and complete the work paid for. Also, I have a voice message from Ken Apologizing on his behavior and telling me he was at faultKen Curtis Construction still did not return to complete the job after I agreed to have him come back
Anyone wanting to hire MRCurtis, I advise you to contact me and I can show you the work and problemsMrCurtis just want to make sure his Revdex.com rating stays good
If Ken wants to finish his job at no additional cost...(because he called once and said he would finish the job only for an additional $10,000---even though he was paid in full) he can

Kenneth R. Curtis Concrete Construction
2146 Skyline Dr. Fullerton, CA 92831
June 28, 2014
Dear Mr. [redacted],
With reference to your letter dated June 24th, 2014. Since I have not had an opportunity to access the property since Saturday, May 3rd, it is difficult for me to address the concerns listed in the complaint.
On May 3rd, your wife and you expressed how lovely the patio looked, and we set a return date for Monday May 5th to complete the unfinished portion of the scope of work in the contract dated April 23, 2014. On May 4th I received a call requesting that I do not return.
Remaining scope to be finished included
1. Saw cutting control joints
2. Saw cut 45 degree angles pattern in the surface
3. Finishing the edge of the step
4. Resurfacing the step with cement to make it aesthetically pleasing after the removal of the brick
5. Pressure wash and seal the surface of the newly poured concrete.
6. Clean up the entire area we unable to do since we could not walk on the freshly poured concrete before the end of the day Saturday May 3rd.
I would like to suggest we meet and review your concerns before we begin the completion of the scope of work listed above. Please call me immediately with a possible date. I am available after July 8th.
Sincerely,
Kenneth R Curtis

TO WHOM IT MAY CONCERNON 10/3/15 KENNETH R. CURTIS CONCRETE CONST. INTERED INTO A CONTRACT WITH MR & MRS [redacted] TO INSTALL BLOCK RET. WALL 2 FT. HIGH THE WALL WAS TO BE VEENERD WITH STONE SUPPLYED BY [redacted] ALSO THE TOP OF THE WALL WAS TO HAVE A STONE CAP. [redacted] DESIDED TO HAVE...

THE WALL STUCCO & CAP WITH A DOUBLE CANTILEVER CAP WITH DARK BROWN COLOR. [redacted] BROUGHT THE CANTILEVER FORMS BROUGHT THEM HOME AND TOLE [redacted] MY FOREMAN TO INSTALL THEM, [redacted] TOLE [redacted] HE HAD TO GET THE OK FORM KEN [redacted] TOLL [redacted] HE WAS THE OWNER & BOSS AND THE ONE PAYING FOR THE WORK SO [redacted] SAID TO [redacted] OK HE PUT THEM ON. [redacted] TOLE ME WHEN HE SIGNED THE CONTRACT THAT THEIR WOULD BE SOME CHANGED AND ADDITIONS BUT HE WOULD PAY FOR THEM. [redacted] TOLE ME THAT HIS DAUGHTER WAS GOING TO HAVE HER 16TH BIRTHDAY AND THEY HAVE A LOT OF PEOPLE COMING FOR THE PARTY AND HE NEEDED THE CONCRETE INSTALLED WE GOT THE CONCRETE DONE ABOUT MIDNIGHT AND THAT MADE HIM HAPPY. EVEN THOUGH I HAD TO BRING IN TWO MORE FINISHER FOR THE SCORING OF THE CONCRETE. MRS [redacted] WANTED THE SCORING DONE WITH A JOINTER INSTED OF SAW CUTTING THEM LIKE THE REST OF THEIR JOINTING THEIR OTHER CONCRETE.THE EXTRAS THAT [redacted] ADDED WERE 1. THE WALL ALONG THE POOL DECK & PL. WALL IN BACK2. WALL AROUND BENCH AT THE FIRE PIT.3. WALL ALONG SLAB AT THE FIRE PIT.4. WALL IN PLANTER AREA BETWEEN STEPS AT FIREPIT AREA.5. 4 SETS OF DRAIN SYSTEMS.6. INSTALLING LIGHTS IN STEPS & PILASTERS (LABOR ONLY)7. 5 LOADS OF DIRT I HAD INSTALL FROM OTHER JOB SITE8. INSTALLING CANTILEVER CAPS ON ALL THE WALLS

Revdex.com:
I have reviewed the response made by the business in reference to complaint ID [redacted], and have determined that this proposed action would not resolve my complaint.  For your reference, details of the offer I reviewed appear below.
The total 1267 Sq.-ft. of concrete patio slab and steps poured and stamped by Contractor Kenneth R Curtis Concrete Construction is a total unrepairable disaster. Which can not be repaired, do to safety and code violations (see Deputy Concrete Inspectors Report). 
Contactor, employed a work crew of  4 unskilled, unsupervised  temporary labors, whom were openly complaining of being over worked and not paid. Workers exhibited poor workmanship and were not concerned about protecting home owners property against damages. (as showed in pictures and stated in Deputy Concrete Inspectors Report sent too, and received by Contractor. Certified mail signed by 5-10-14).
Contractor Kenneth R Curtis is aware of property damages and code violations. Contractor is also aware that the entire patio slab will have to be demolished and replaced.
The cost for replacing and repairing all concrete and property damages is estimated at $25,000
Home Owner has already and continues to extend an open invention to Contractor Kenneth R Curtis Concrete Construction, to have a mutually approved Concrete certified Inspector of his choice visit and inspect his work at my home.  
       
Regards,
[redacted]

Revdex.com:
I have reviewed the response made by the business in reference to complaint ID [redacted], and have determined that this proposed action would not resolve my complaint.  For your reference, details of the offer I reviewed appear below.
Mr. Curtis has lost a claim against his bond insurance.. the state of CA. Has been notified and will notify him to suspend his licence because of breach of contract. Unless he corrects his issues with the bond comp. The insurance bond company and the state contractors board has found enough evidence to justify my claim action. Now to answer Me. Curtis, yes there were changes I made...and yes there was a final amended contract by both Mr Curtis and I. Yes we both agreed on a final cost of project. It was after that Mr. Curtis said he needed more money...$10K more money.. he told me he needed to pay his guys. Also, as a contractor you should know that you don't start pouring concrete at 1 pm. The workers did work late and it was till 8 pm not midnight. They also started late because Mr. Curtis failed to appropriately coordinate materials,workers,and cement. The workers sat at my house for 4 hours before concrete arrived. And yes I did have a party planned, but Mr. Curtis had over a month to complete the concrete....he routinely had one worker here and rarely had materials available for him to do stuff. That's the reason why I had to buy material that was never compensated for. The workers also did a hurry up job, forgetting critical steps and items on the plans.... Ruined my pool coping by pouring up against pool with no expansion joints. This was proven to be incorrect by industry experts,state contractors board, an bond company. I did tell his workers that I was the boss because they were cutting corners and doing incorrect things. The best part is that they did not know I spoke Spanish after I corrected and heard all their complaining on Mr curtis, pay, materials,and my ability to correct their work. Mr. Curtis had a written contract with me for color concrete...he then tells me the color is extra and not included in the contract ....he only wrote color concrete because that's what it's called....not because it's part of the bid. ** ...Mr. Curtis also call me months after he abandoned the job site and wanted to finish the job. This was only after he was notified by his bond company and state contractors board as of failure to perform a job and penalty of payment. Mr. Curtis told me on the phone.." hi [redacted], I didn't know you had paid so much money....I'd like to come back and finish the job.." Really? Because you didn't keep accounting of the checked cashed by you.? This was an example of his lying. Mr. Curtis had plenty of opportunities to correct his work, he failed to do so and did a bad job, even though he admitted he did not do what was right. I'm not looking for free work, I was just looking for him to do what I paid him to do. 7 months later my work is still not compete and I have to hire someone else to correct and finish his mistakes and insurance company , state license board, and three independent contractors agree with me...I would not ever rate MR. Curtis at a high rating. He turned to be a fraud, liar, and tried to lie his way so you won't change your rating. Anyone wanting to contact me for details I will be happy to answer any questions and send pictures of his poor job.
Regards,
[redacted]

Revdex.com:
I have reviewed the response made by the business in reference to complaint ID [redacted], and have determined that this proposed action would not resolve my complaint.  For your reference, details of the offer I reviewed appear below.Mr. Curtis has lost a claim against his bond insurance.. the state of CA. Has been notified and will notify him to suspend his licence because of breach of contract. Unless he corrects his issues with the bond comp. The insurance bond company and the state contractors board has found enough evidence to justify my claim action. 
Now to answer Me. Curtis, yes there were changes I made...and yes there was a final amended contract by both Mr Curtis and I. Yes we both agreed on a final cost of project. It was after that Mr. Curtis said he needed more money...$10K more money.. he told me he needed to pay his guys. Also, as a contractor you should know that you don't start pouring concrete at 1 pm. The workers did work late and it was till 8 pm not midnight. They also started late because Mr. Curtis failed to appropriately coordinate materials,workers,and cement. The workers sat at my house for 4 hours before concrete arrived. And yes I did have a party planned, but Mr. Curtis had over a month to complete the concrete....he routinely had one worker here and rarely had materials available for him to do stuff. That's the reason why I had to buy material that was never compensated for. The workers also did a hurry up job, forgetting critical steps and items on the plans.... Ruined my pool coping by pouring up against pool with no expansion joints. This was proven to be incorrect by industry experts,state contractors board, an bond company. I did tell his workers that I was the boss because they were cutting corners and doing incorrect things. The best part is that they did not know I spoke Spanish after I corrected and heard all their complaining on Mr curtis, pay, materials,and my ability to correct their work. Mr. Curtis had a written contract with me for color concrete...he then tells me the color is extra and not included in the contract ....he only wrote color concrete because that's what it's called....not because it's part of the bid. ** ...
Mr. Curtis also call me months after he abandoned the job site and wanted to finish the job. This was only after he was notified by his bond company and state contractors board as of failure to perform a job and penalty of payment. Mr. Curtis told me on the phone.." hi [redacted], I didn't know you had paid so much money....I'd like to come back and finish the job.." 
Really? Because you didn't keep accounting of the checked cashed by you.? This was an example of his lying. Mr. Curtis had plenty of opportunities to correct his work, he failed to do so and did a bad job, even though he admitted he did not do what was right. I'm not looking for free work, I was just looking for him to do what I paid him to do. 7 months later my work is still not compete and I have to hire someone else to correct and finish his mistakes and insurance company , state license board, and three independent contractors agree with me...
I would not ever rate MR. Curtis at a high rating. He turned to be a fraud, liar, and tried to lie his way so you won't change your rating. Anyone wanting to contact me for details I will be happy to answer any questions and send pictures of his poor job.
Regards,
[redacted]

On 04/23/14, I, Kenneth A. Curtis Concrete Construction, and Mr. & Mrs. [redacted]
entered into a signed contract to remove and replace the existing concrete patio,
walkway and steps. The work to be done was for the above listed address.
On Monday, 4/28/14, my...

crew and I came to your home and began the agreed upon
work. On Friday, 5/2/14 and Saturday, 5/3/14, my crew installed the concrete patio,
walkway, steps and curbing. On this same Saturday, I personally told you I would return
on Monday, 5/5/14, to complete the balance of the contracted work, to which you
agreed. You made no mention of any aspects of my work you were not happy with. At
one point on Saturday, your wife commented to my crew and me, "It looks beautiful!"
On Sunday, 5/4/14 at approximately 9:42am, I received a telephone voicemail message
from you. You told me not to return to your home saying you wanted to bring another
contractor in to "try to repair some of the damage" my crew caused. You did not specify
what any of the damages were.
Whatever it is that you feel is incorrect, I would like to be informed and given a chance
to correct it. 1 take great pride in my work product and as you know, I maintain a AAA
rating with the Revdex.com.
I look forward to hearing back from you soon and bringing the best resolution to all
parties involved.
Sincerely,
Kenneth R. Curtis

TO WHOM IT MAY CONCERN
ON 10/3/15 KENNETH R. CURTIS CONCRETE CONST. INTERED INTO A CONTRACT WITH MR & MRS [redacted] TO INSTALL BLOCK RET. WALL 2 FT. HIGH THE WALL WAS TO BE VEENERD WITH STONE SUPPLYED BY [redacted] ALSO THE TOP OF THE WALL WAS TO HAVE A STONE CAP. [redacted] DESIDED...

TO HAVE THE WALL STUCCO & CAP WITH A DOUBLE CANTILEVER CAP WITH DARK BROWN COLOR. [redacted] BROUGHT THE CANTILEVER FORMS BROUGHT THEM HOME AND TOLE [redacted] MY FOREMAN TO INSTALL THEM, [redacted] TOLE [redacted] HE HAD TO GET THE OK FORM KEN [redacted] TOLL [redacted] HE WAS THE OWNER & BOSS AND THE ONE PAYING FOR THE WORK SO [redacted] SAID TO [redacted] OK HE PUT THEM ON. [redacted] TOLE ME WHEN HE SIGNED THE CONTRACT THAT THEIR WOULD BE SOME CHANGED AND ADDITIONS BUT HE WOULD PAY FOR THEM. [redacted] TOLE ME THAT HIS DAUGHTER WAS GOING TO HAVE HER 16TH BIRTHDAY AND THEY HAVE A LOT OF PEOPLE COMING FOR THE PARTY AND HE NEEDED THE CONCRETE INSTALLED WE GOT THE CONCRETE DONE ABOUT MIDNIGHT AND THAT MADE HIM HAPPY. EVEN THOUGH I HAD TO BRING IN TWO MORE FINISHER FOR THE SCORING OF THE CONCRETE. MRS [redacted] WANTED THE SCORING DONE WITH A JOINTER INSTED OF SAW CUTTING THEM LIKE THE REST OF THEIR JOINTING THEIR OTHER CONCRETE.THE EXTRAS THAT [redacted] ADDED WERE 1. THE WALL ALONG THE POOL DECK & PL. WALL IN BACK
2. WALL AROUND BENCH AT THE FIRE PIT.
3. WALL ALONG SLAB AT THE FIRE PIT.
4. WALL IN PLANTER AREA BETWEEN STEPS AT FIREPIT AREA.
5. 4 SETS OF DRAIN SYSTEMS.
6. INSTALLING LIGHTS IN STEPS & PILASTERS (LABOR ONLY)
7. 5 LOADS OF DIRT I HAD INSTALL FROM OTHER JOB SITE
8. INSTALLING CANTILEVER CAPS ON ALL THE WALLS

Revdex.com:
I have reviewed the response made by the business in reference to complaint ID [redacted], and have determined that this proposed action would not resolve my complaint.  For your reference, details of the offer I reviewed appear below.
Regards,
[redacted]
Ken had every opportunity to come back and finish the job contracted to do. Ken contacted me only after his bond insurance company and the state contractors board communicated with him.( that was almost 2 months after he abandoned job). I did receive a call from ken and I did tell him that I did not want any workers at my house if I wasn't there to supervise their work. On that same day he called, his insurance company and the state contractors board also called to inform me that they both had completed their investigation and found sufficient evidence of the poor work, violation/ breech of contract and work not completed to industry standards.Ken agreed to any change and cost of the work done. He himself listed an itemized list and cost associated with the changes. It was after he was paid that he tried to tell me he wanted an additional $10,000 to finish the job. I asked him what that cost was and to let me see his new charges. he gave me a list of the same items just more money attached to it. he agreed on any changes and cost, then tried to tell me that I changed things. The SCB found evidence of his breech of contract, I simply wanted to have him finish what he was paid for, and that did not happen. His bond insurance also found evidence of his poor work and judgement went to me. I now have to find another person to complete and redo his job. Ken also stated he didn't charge me for dirt and walls.....I have the contract amendment  that he wrote that says he did. "moving dirt......$400.00, total wall construction including caps.. charges listed on contract (im at work and not at home to verify the correct amount), drains...$900.00, electrical work $150.00," and so on .......  This man can not get his facts straight. Ken makes no mention of the fact that his workers used my building materials that I had on my property from a previous job because Ken would not deliver materials to work with on a timely matter. Ken also fails to mention that his workers did not know I speak spanish. I could hear them speaking about how they can just " not do it that way because its cost too much for Ken. or when asked about mistakes or problems they would talk to themselves and the foreman Pace, and say " they forgot to do it"I will be continuing legal matter against him and his company. He will be receiving a small claims court case hearing date. According to the bond insurance company and state contractors board, I have sufficient evidence that Ken Curtis abandoned the job, failed to comply with industry standards, and had every opportunity to correct his work and complete the work paid for.  Also, I have a voice message from Ken Apologizing on his behavior and telling me he was at fault. Ken Curtis Construction still did not return to complete the job after I agreed to have him come back. Anyone wanting to hire MR. Curtis, I advise you to contact me and I can show you the work and problems. Mr. Curtis just want to make sure his Revdex.com rating stays good. If Ken wants to finish his job at no additional cost...(because he called once and said he would finish the job only for an additional $10,000---even though he was paid in full) he can...

There are no questions to answer.  Do you want me to respond that the case is closed?  The case is closed!   The customer settled with the bond company.  We are in good standing with the contractors board & the bonding company.
Kenneth R Curtis
Owner of Kenneth R Curtis Concrete Construction

Check fields!

Write a review of Kenneth R Curtis Concrete Construction

Satisfaction rating
 
 
 
 
 
Upload here Increase visibility and credibility of your review by
adding a photo
Submit your review

Kenneth R Curtis Concrete Construction Rating

Overall satisfaction rating

Address: 2146 Skyline Dr, Fullerton, California, United States, 92831

Phone:

Show more...

Add contact information for Kenneth R Curtis Concrete Construction

Add new contacts
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | New | Updated