Sign in

Kozlowski Construction

Sharing is caring! Have something to share about Kozlowski Construction? Use RevDex to write a review
Reviews General Contractor Kozlowski Construction

Kozlowski Construction Reviews (2)

Regarding extra polntin& there was more square footage work to be done.Customer failed to state that driveway approach that cracked was cut out& replaced by contractor with no additional cost to customer.One of the garage slabs was 7" & extra work & gravel was necessary to finishjob
This was an extra charge.Regarding the stoop, if we were to replace it the cost would be extensive & thecustomer chose the choice of putting a topping on to cover the chips.We told the customer we could not guarantee that system.All Ready Mix Companies have a problem with churt pops, which means thatthe surface of the cement may flake & spaidThe concrete on the approachcracked inches away from the control jointNo contractor or engineer canexplain why concrete cracksWe will try to correct this problem of the stoopin Spring when the weather permits but, again, we will not guarantee it becauseof chemicals & salt used on the stoopWe as contractors apply the materials& do the finishing of the product but we cannot be responsible for materialfailuresThe best concrete was used on this job, bag low churtThis meansthat it could spaid.*** **

Review: Kazlowski Construction was hired to replace two (2) garage floors, two (2) driveways, a side walk, stoop and tuckpointing. He charged extra for the tuckpointing (more than the quote), and 1 garage floor because he claimed it was thicker than normal. The other garage floor cracked in 10 days and the stoop has has concrete chipping off. One of the driveway's approach is cracked by the concrete truck because the area was not covered. I had a credit coming for work that I decided not to do, but it was not applied because he said that one garage floor was thicker than normal.Desired Settlement: I am looking for repair to the chipping stoop.

Business

Response:

Regarding extra polntin& there was more square footage work to be done.Customer failed to state that driveway approach that cracked was cut out& replaced by contractor with no additional cost to customer.One of the garage slabs was 7" & extra work & gravel was necessary to finishjob. This was an extra charge.Regarding the stoop, if we were to replace it the cost would be extensive & thecustomer chose the choice of putting a topping on to cover the chips.We told the customer we could not guarantee that system.All Ready Mix Companies have a problem with churt pops, which means thatthe surface of the cement may flake & spaid. The concrete on the approachcracked 4 inches away from the control joint. No contractor or engineer canexplain why concrete cracks. We will try to correct this problem of the stoopin Spring when the weather permits but, again, we will not guarantee it becauseof chemicals & salt used on the stoop. We as contractors apply the materials& do the finishing of the product but we cannot be responsible for materialfailures. The best concrete was used on this job, 6 bag low churt. This meansthat it could spaid.[redacted]

Check fields!

Write a review of Kozlowski Construction

Satisfaction rating
 
 
 
 
 
Upload here Increase visibility and credibility of your review by
adding a photo
Submit your review

Kozlowski Construction Rating

Overall satisfaction rating

Description: Contractors - General

Address: 1021 Webster St, Ottawa, Illinois, United States, 61350-3360

Phone:

Show more...

Add contact information for Kozlowski Construction

Add new contacts
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | New | Updated