Failure to pay vendor for material Vendor placed Lein against my property even though Kuntry Haven was paid in full for labor and materials Kuntry Haven failed to pay [redacted] for material used to build my pole barn Contract with Kuntry Haven included materials and labor Now I have a lein from [redacted] for failure to pay for materials

work was not completed as agreed on demolition and replacement of and old porch that was to take a few day drug out for three weeksthe job was never completed even after a couple of emails with [redacted] apologizing stating it had slipped his mind to complete the jobHe had not forgotten to stop by a couple of weeks before to collect the money stating the work would be completed that dayI Emailed him a couple more time but received no responseIt has been over a month and I hired a finish man to complete the job which cost me $

Concrete patio job did not turn out as expected or as demonstrated in pictures presented beforehand First off all the crew left concrete chunks in my yard and I contacted [redacted] He said SORRY! I also discussed with [redacted] the color is not marbled like the pictures I was shown He told me to give it time, it will lighten up I called him later in the year and told him it is still solid grey and he was very snippy and said to call him in March It is now April and I have emailed and called and left messages several times My son has tried reaching him as well He will not return calls or emails My concrete has a large crack in it which appears to be the result of the foundation under it, because the crack is close to the inside edge And it is still a solid grey color instead of the two tone grey I paid for I paid for light grey cement and they put a color on top of the wet cement and a matting to put texture on the surface In addition, the steps they poured are crumblin

Failure to finish clean up, after work performed in fall of We had several thousand dollars or work done here within our communityJestin starting dumping his old concrete he removed in our back field areaI told Jestin, we could not do thisJestin stated he would be back to remove concrete, as soon as area dried outAs of todays date 10/29/2016, Jestin still has not return to take care of this issueI have left multiple calls on his phone and still no responseThis needs to be taken care of immediately

Verbal Stated That A Warranty Certificate Would Be Issued, But Has Not Followed Through With One I had a new metal roof installed on my house and garage, being completed on June 8, When MrS [redacted] stopped by to collect the final payment, he verbally stated to both my wife and I that a warranty certificate for the metal roof would be included with my "bill paid in full" receipt When I received the "paid in full receipt", there was no warranty certificate I contacted MrS [redacted] about this and he responded that he would check on the whereabouts of the warranty certificate and let me know That was the last communication I have had from him I have texted, called, and even sent a letter to him inquiring about my warranty certificateThere have been no responses of any kind from MrS***

work was not completed as agreed on
demolition and replacement of and old porch that was to take a few day drug out for three weeksthe job was never completed even after a couple of emails with *** *** apologizing stating it had slipped his mind to complete the jobHe had not forgotten to stop by a couple of weeks before to collect the money stating the work would be completed that dayI Emailed him a couple more time but received no responseIt has been over a month and I hired a finish man to complete the job which cost me $

Failure to finish clean up, after work performed in fall of
We had several thousand dollars or work done here within our communityJestin starting dumping his old concrete he removed in our back field areaI told Jestin, we could not do thisJestin stated he would be back to remove concrete, as soon as area dried outAs of todays date 10/29/2016, Jestin still has not return to take care of this issueI have left multiple calls on his phone and still no responseThis needs to be taken care of immediately

Concrete patio job did not turn out as expected or as demonstrated in pictures presented beforehand
First off all the crew left concrete chunks in my yard and I contacted *** He said SORRY! I also discussed with *** the color is not marbled like the pictures I was shown He told me to give it time, it will lighten up I called him later in the year and told him it is still solid grey and he was very snippy and said to call him in March It is now April and I have emailed and called and left messages several times My son has tried reaching him as well He will not return calls or emails My concrete has a large crack in it which appears to be the result of the foundation under it, because the crack is close to the inside edge And it is still a solid grey color instead of the two tone grey I paid for I paid for light grey cement and they put a color on top of the wet cement and a matting to put texture on the surface In addition, the steps they poured are crumblin

Verbal Stated That A Warranty Certificate Would Be Issued, But Has Not Followed Through With One
I had a new metal roof installed on my house and garage, being completed on June 8, When MrS*** stopped by to collect the final payment, he verbally stated to both my wife and I that a warranty certificate for the metal roof would be included with my "bill paid in full" receipt When I received the "paid in full receipt", there was no warranty certificate I contacted MrS*** about this and he responded that he would check on the whereabouts of the warranty certificate and let me know That was the last communication I have had from him I have texted, called, and even sent a letter to him inquiring about my warranty certificateThere have been no responses of any kind from MrS***

I wrote a check for $12,to KHC Construction 08/23/as a down payment for construction of a 30x50xpole barn, I was told that he found that when the material is paid for in front, the material is delivered faster*** (owner) told me that the barn would be built in 4-weeks when the material arrivedI have reached out to *** several times to find out when my barn was going to be built and the last response that I received was 11/stating that it would be next Tuesday (11/14)I have tried calling and texting ***, to find out what was taking so longwithout any responseI was in the process of moving out of my previous home and needed the barn built so I could move my stuff in to the barnI have sense moved everything out and have a lot of my stuff sitting out in the weather because I have no room to put it insideIt appears that *** has no intention of building my barn in the timely manner that was promised
Product_Or_Service: 30x50xPole

Company provided poor customer service and product delivery
7/$
Upon completion of our concrete patio and after the crew had left, it was discovered a chunk of the side was cracked and broken, there were concrete splatter on the house and holes/gaps in the patio In addition to the poor quality of work, yard clean up was found to be poured as chunks of concrete and stone were found scattered throughout the yard and the crew tried to hide it by covering it with dirt The company was contacted, asked to return and fix these problems, which was done but the patio was fixed with some sort of epoxy, which has left three dark discolored marks on the patio Follow up to resolve the issue resulted in a company representative coming to the home suggesting 'painting' the entire patio with a multi-component polyurethane sealant in hopes of covering up the marks When the company was contacted to discuss other options, contact was never made and messages never returned To this po

Failure to pay vendor for material Vendor placed Lein against my property even though Kuntry Haven was paid in full for labor and materials
Kuntry Haven failed to pay *** for material used to build my pole barn Contract with Kuntry Haven included materials and labor Now I have a lein from *** for failure to pay for materials

I payed my mortgage on the of the month in side my grace period 1- and khc is charging me a late fee be cause I used the automatic pay by phone after 1pm this is not right I should have till the end of the business day to pay kha sent me a letter of late payment after the payment was withdrawn out of my account the whole thing is I am not late there way of doing business is to make you late to make more money the personal I spoke to where all about hate and would not help me I am not saying that I was that nice either but being told you late and there's nothing we can do but take your payment of late fee for not being late

Check fields!

Write a review of Kuntry Haven Construction, LLC

Satisfaction rating
 
 
 
 
 
Upload here Increase visibility and credibility of your review by
adding a photo
Submit your review

Kuntry Haven Construction, LLC Rating

Overall satisfaction rating

Add contact information for Kuntry Haven Construction, LLC

Add new contacts
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | New | Updated