Sign in

Master Craftsman Flooring Co

Sharing is caring! Have something to share about Master Craftsman Flooring Co? Use RevDex to write a review
Reviews Master Craftsman Flooring Co

Master Craftsman Flooring Co Reviews (17)

Initial Business Response / [redacted] (1000, 5, 2015/09/08) */ We refinished an existing very damaged flooring and Mr [redacted] approved completed job, inspected and paid in fullThenHis tentant and Son [redacted] said there were some areas that needed touch upMr [redacted] was to meet me and I touched up areas per [redacted] because his Dad never came to meet meHe did live across the job site [redacted] took the stain an proceed to do more touch ups all over the edgesI ask him to not do anything that it will mess it upHe refused to listen and I took my iPhone shot images of him doing thatI did however agreed back bedroom was recorded and stain must not of dried were fore need to be resandedI offered to resanded however Mr [redacted] refused to allow me tooI offered he avoids that his Son [redacted] messed floor up by interfering with touch upsDuring this process I tried many times to call but [redacted] phone most time said not in serviceI did have a contract with him and at all times conducted by issues in a workman like manor

In response,Ijust saw this complaint and It true I did not see it was a prefinished when I did estimate during evening hoursI did say it might need a double sandingI did agree to a lighter stain but they decided to go darker and why I said it might need double sandibgWhen I proceed to stain and next day coats none of the old lighter prefinished showed up until next dayBoth my client and myself looked at finished floor and nothing showed a problem and he paid me after looking.NNext day areas showed up as if the finish ate through areas on sides or lighting showed during day differentClient called me ask me to resand instead of fixing areas and volentered ? to pay me I agreedIagreed to fix floors but was leaving out town for few daysWhen I got back we were going to resand, my worker and myself stopped for lunch down the street from jobsite.? MyMy worker got sick threw up and I saw in his eyes he was sickI called client he got upsetI wanted go back in days cause my son's wife next day arranged to have there new baby to be deliveredI have a life just the samepeople get sick and my grandson was going be bornClient was angry and got mad also that I wanted what we agreed about in writing not limited to document that we our reduingIn past we started job with trust he sent deposit no sign contract e did job and after fact did signI stand behind my work and ended up he refused to not let me resand saying in this complaint that I'm not capable ? to doNo he got mad cause I wanted document our agreement but now imo he said the to get me to resand but had no intention to pay itIn fact his wife email me a complaint saying how dare me charge him yet it was his idea I even said you don't have to pay that IL do it without but he insisted to pay so flip flop.HeHe mad cause I wanted be at my son's wife having a baby is redicuioloius ? big deal a few days

I do stand behind my work .Iexplained that I could not due to illness and my grandson being born, so I needed few days and your husband who your speaking for canceled meYour husband and I had conversations about and the day I was going to do resanding he was supine to meet me instead he left me garage code and my guy and myself unfortantly ? got illI have said textes as I stated prior response[redacted] ***!!!

Complaint: [redacted] I am rejecting this response because:we already had someone fix what he completely messed upWe DO NOT want anything other than a refundTwo chances was enoughWe will appearently have to take a different route to get our refund.? Sincerely, [redacted]

In response, Ijust saw this complaint and It true I did not see it was a prefinished when I did estimate during evening hoursI did say it might need a double sandingI did agree to a lighter stain but they decided to go darker and why I said it might need double sandibgWhen I proceed to stain and next day coats none of the old lighter prefinished showed up until next dayBoth my client and myself looked at finished floor and nothing showed a problem and he paid me after looking.NNext day areas showed up as if the finish ate through areas on sides or lighting showed during day differentClient called me ask me to resand instead of fixing areas and volentered to pay me I agreed Iagreed to fix floors but was leaving out town for few daysWhen I got back we were going to resand, my worker and myself stopped for lunch down the street from jobsite MyMy worker got sick threw up and I saw in his eyes he was sickI called client he got upsetI wanted go back in days cause my son's wife next day arranged to have there new baby to be deliveredI have a life just the samepeople get sick and my grandson was going be bornClient was angry and got mad also that I wanted what we agreed about in writing not limited to document that we our reduingIn past we started job with trust he sent deposit no sign contract e did job and after fact did signI stand behind my work and ended up he refused to not let me resand saying in this complaint that I'm not capable to doNo he got mad cause I wanted document our agreement but now imo he said the to get me to resand but had no intention to pay itIn fact his wife email me a complaint saying how dare me charge him yet it was his idea I even said you don't have to pay that IL do it without but he insisted to pay so flip flopHeHe mad cause I wanted be at my son's wife having a baby is redicuioloius big deal a few days

I do stand behind my work .Iexplained that I could not due to illness and my grandson being born, so I needed few days and your husband who your speaking for canceled meYour husband and I had conversations about and the day I was going to do resanding he was supine to meet me instead he left me garage code and my guy and myself unfortantly got illI have said textes as I stated prior response.** ***!!!

In response,Ijust saw this complaint and It true I did not see it was a prefinished when I did estimate during evening hoursI did say it might need a double sandingI did agree to a lighter stain but they decided to go darker and why I said it might need double sandibgWhen I proceed to stain
and next day coats none of the old lighter prefinished showed up until next dayBoth my client and myself looked at finished floor and nothing showed a problem and he paid me after looking.NNext day areas showed up as if the finish ate through areas on sides or lighting showed during day differentClient called me ask me to resand instead of fixing areas and volentered to pay me I agreedIagreed to fix floors but was leaving out town for few daysWhen I got back we were going to resand, my worker and myself stopped for lunch down the street from jobsite. MyMy worker got sick threw up and I saw in his eyes he was sickI called client he got upsetI wanted go back in days cause my son's wife next day arranged to have there new baby to be deliveredI have a life just the samepeople get sick and my grandson was going be bornClient was angry and got mad also that I wanted what we agreed about in writing not limited to document that we our reduingIn past we started job with trust he sent deposit no sign contract e did job and after fact did signI stand behind my work and ended up he refused to not let me resand saying in this complaint that I'm not capable to doNo he got mad cause I wanted document our agreement but now imo he said the to get me to resand but had no intention to pay itIn fact his wife email me a complaint saying how dare me charge him yet it was his idea I even said you don't have to pay that IL do it without but he insisted to pay so flip flop.HeHe mad cause I wanted be at my son's wife having a baby is redicuioloius big deal a few days

I do stand behind my work .Iexplained that I could not due to illness and my grandson being born, so I needed few days and your husband who your speaking for canceled meYour husband and I had conversations about and the day I was going to do resanding he was supine to meet me instead he left me garage code and my guy and myself unfortantly got illI have said textes as I stated prior response.** ***!!!

Initial Business Response /* (1000, 5, 2015/09/08) */
We refinished an existing very damaged flooring and Mr *** approved completed job, inspected and paid in full ThenHis tentant and Son *** said there were some areas that needed touch upMr *** was to meet me and I touched up areas per
*** because his Dad never came to meet meHe did live across the job site*** took the stain an proceed to do more touch ups all over the edgesI ask him to not do anything that it will mess it upHe refused to listen and I took my iPhone shot images of him doing thatI did however agreed back bedroom was recorded and stain must not of dried were fore need to be resandedI offered to resanded however Mr*** refused to allow me tooI offered he avoids that his Son *** messed floor up by interfering with touch upsDuring this process I tried many times to call but *** phone most time said not in serviceI did have a contract with him and at all times conducted by issues in a workman like manor

Complaint: ***
I am rejecting this response because:we already had someone fix what he completely messed upWe DO NOT want anything other than a refundTwo chances was enoughWe will appearently have to take a different route to get our refund.?
Sincerely,
*** ***

Complaint: [redacted]
I am rejecting this response because:we already had someone fix what he completely messed up. We DO NOT want anything other than a refund. Two chances was enough. We will appearently have to take a different route to get our refund. 
Sincerely,
[redacted]

Initial Business Response /* (1000, 5, 2015/09/08) */
We refinished an existing very damaged flooring and Mr [redacted] approved completed job, inspected and paid in full. Then. His tentant and Son [redacted] said there were some areas that needed touch up. Mr [redacted] was to meet me and I touched up areas per...

[redacted] because his Dad never came to meet me. He did live across the job site. [redacted] took the stain an proceed to do more touch ups all over the edges. I ask him to not do anything that it will mess it up. He refused to listen and I took my iPhone shot images of him doing that. I did however agreed back bedroom was recorded and stain must not of dried were fore need to be resanded. I offered to resanded however Mr. [redacted] refused to allow me too. I offered 300.00 he avoids that his Son [redacted] messed floor up by interfering with touch ups. During this process I tried many times to call but [redacted] phone most time said not in service. I did have a contract with him and at all times conducted by issues in a workman like manor

In response,Ijust saw this complaint and It true I did not see it was a prefinished when I did estimate during evening hours. I did say it might need a double sanding. I did agree to a lighter stain but they decided to go darker and why I said it might need double sandibg. When I proceed to stain...

and next day coats none of the old lighter prefinished showed up until next day. Both my client and myself looked at finished floor and nothing showed a problem and he paid me after looking.NNext day areas showed up as if the finish ate through areas on sides or lighting showed during day different. Client called me ask me to resand instead of fixing areas and volentered  to pay me 400.00. I agreedIagreed to fix floors but was leaving out town for few days. When I got back we were going to resand, my worker and myself stopped for lunch down the street from jobsite. MyMy worker got sick threw up and I saw in his eyes he was sick. I called client he got upset. I wanted go back in 2 days cause my son's wife next day arranged to have there new baby to be delivered. I have a life just the same.. people get sick and my grandson was going be born. Client was angry and got mad also that I wanted what we agreed about 400 in writing not limited to document that we our reduing. In past we started job with trust he sent deposit no sign contract e did job and after fact did sign. I stand behind my work and ended up he refused to not let me resand saying in this complaint that I'm not capable  to do. No he got mad cause I wanted document our agreement but now imo he said the 400 to get me to resand but had no intention to pay it. In fact his wife email me a complaint saying how dare me charge him 400 yet it was his idea I even said you don't have to pay that IL do it without 400 but he insisted to pay so flip flop.HeHe mad cause I wanted be at my son's wife having a baby is redicuioloius  big deal a few days.

In response,
Ijust saw this complaint and It true I did not see it was a prefinished when I did estimate during evening hours. I did say it might need a double sanding. I did agree to a lighter stain but they decided to go darker and why I said it might need double sandibg. When I proceed...

to stain and next day coats none of the old lighter prefinished showed up until next day. Both my client and myself looked at finished floor and nothing showed a problem and he paid me after looking.NNext day areas showed up as if the finish ate through areas on sides or lighting showed during day different. Client called me ask me to resand instead of fixing areas and volentered  to pay me 400.00. I agreed
Iagreed to fix floors but was leaving out town for few days. When I got back we were going to resand, my worker and myself stopped for lunch down the street from jobsite. 
MyMy worker got sick threw up and I saw in his eyes he was sick. I called client he got upset. I wanted go back in 2 days cause my son's wife next day arranged to have there new baby to be delivered. I have a life just the same.. people get sick and my grandson was going be born. Client was angry and got mad also that I wanted what we agreed about 400 in writing not limited to document that we our reduing. In past we started job with trust he sent deposit no sign contract e did job and after fact did sign. I stand behind my work and ended up he refused to not let me resand saying in this complaint that I'm not capable  to do. No he got mad cause I wanted document our agreement but now imo he said the 400 to get me to resand but had no intention to pay it. In fact his wife email me a complaint saying how dare me charge him 400 yet it was his idea I even said you don't have to pay that IL do it without 400 but he insisted to pay so flip flop.
HeHe mad cause I wanted be at my son's wife having a baby is redicuioloius  big deal a few days.

Complaint: [redacted]
I am rejecting this response because:
we already had someone fix what he completely messed up. We DO NOT want anything other than a refund. Two chances was enough. We will appearently have to take a different route to get our refund. 
Sincerely,
[redacted]

I do stand behind my work .
Iexplained that I could not due to illness and my grandson being born, so I needed few days and your husband who your speaking for canceled me. Your husband and I had conversations about 400 and the day I was going to do resanding he was supine to meet me instead he left me garage code and my guy and myself unfortantly  got ill. I have said textes as I stated prior response.
[redacted]!!!

Initial Business Response /* (1000, 5, 2015/09/08) */
We refinished an existing very damaged flooring and Mr [redacted] approved completed job, inspected and paid in full. Then. His tentant and Son [redacted] said there were some areas that needed touch up. Mr [redacted] was to meet me and I touched up...

areas per [redacted] because his Dad never came to meet me. He did live across the job site. [redacted] took the stain an proceed to do more touch ups all over the edges. I ask him to not do anything that it will mess it up. He refused to listen and I took my iPhone shot images of him doing that. I did however agreed back bedroom was recorded and stain must not of dried were fore need to be resanded. I offered to resanded however Mr. [redacted] refused to allow me too. I offered 300.00 he avoids that his Son [redacted] messed floor up by interfering with touch ups. During this process I tried many times to call but [redacted] phone most time said not in service. I did have a contract with him and at all times conducted by issues in a workman like manor

Check fields!

Write a review of Master Craftsman Flooring Co

Satisfaction rating
 
 
 
 
 
Upload here Increase visibility and credibility of your review by
adding a photo
Submit your review

Master Craftsman Flooring Co Rating

Overall satisfaction rating

Address: 1500 Hackberry Rd, Deerfield, Illinois, United States, 60015-3929

Phone:

Show more...

Web:

www.themastercraftsman.us

This site can’t be reached

Shady, yet now dead: once upon a time this website was reported to be associated with Master Craftsman Flooring Co, but after several inspections we’ve come to the conclusion that this domain is no longer active.



Add contact information for Master Craftsman Flooring Co

Add new contacts
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | New | Updated