Following please find the letter from Shaw declining a warranty claim The inspector noted the floor was very soiled The customer damaged the floor We have received the inspection report by an independent inspection agency in response to the above claim filed on style #***/ [redacted] II, color #***/ [redacted] citing laminate is blisteringEnclosed you will find a copy of the independent inspection report which indicates that the material is exhibiting the following: • Locally caused damage due to topical moisture and uneven sub-floor • No manufacturing related concerns found Based on the conclusion of the information received, there is no cause for further consideration of this matter from a warranty standpointTo obtain a copy of the complete warranty, contact our [redacted] Information Center at ###-###-#### or visit our website at www[redacted] .com Sincerely [redacted] SrClaims Manager

Mrs [redacted] was informed that metals would need to be installed in all doorways with uneven floors At the time of installation, the installers checked with the adult present during the time the work was being completed While this was not the homeowner, it was the sister-in-law of Mrs [redacted] who was moving into the house The installers told her the metals were being installed and she agreed At no time did the sister-in-law ask the installers to wait until she checked with the homeowner before continuing As per our conversation at the time of measurement, Mrs [redacted] was informed that metals needed to be used in order to prevent the carpet from separating It was not possible to create a seam in the doorways due to uneven floors Seaming the carpet at the floor was not the best option, as the seams would separate and would require multiple service calls over time and would not be rectified without the use of metals In one of the photographs, Mrs [redacted] shows a picture of a door into a closet where a metal was not used This is because the floor at that point is level and did not require one In regards to her statements about calling her about job completion, she called the store the very next morning (Wednesday) before we had the opportunity to call her, and told her it would be finished Friday or Saturday She informed us it needed to be done on Friday and we accommodated this requestIt is unfortunate that Mrs [redacted] is unsatisfied with the completed job, however, it was done according to the signed contract and conversation at time of measurement and installation

On Monday October 16th,2017, Bill P [redacted] Jrand two other installers installed a new floor at Mr [redacted] 's House They removed one layer of 1/4" plywood, installed a new layer of 1/4" plywood and then vinyl on top of that They did not do any work to the original sub floor of the house The job took a little over four hours to complete The job was a 12'x15' kitchen with three installers and no baseboard to install This is the time it should've taken Nothing was hurried, nothing was a poor job Bill P [redacted] Jrwalked the job with Mr [redacted] when they where finished After the inspection of the new floor Mr [redacted] said " Everything looks great" and paid the balance of the job Two weeks after the installation, on Monday October 30,at 3:pm, Mr [redacted] called about hearing squeaks, not five days later like Mr [redacted] states During those two weeks, Mr [redacted] had other contractors in the house to install cabinets and counter tops On Wednesday November 15,Bill P [redacted] Srwent out to see the job He inspected the floor and found the 1/4" plywood we installed, was tight to the subfloor He went down to the basement with Mr [redacted] , and saw the imperfections in the customer's tongue and groove sub floor Bill P [redacted] pointed that out to Mr [redacted] Mr [redacted] said he would try to address that issue He stated in his letter that some of the work he did below helped This alone states the squeaks were in the original tongue and groove sub floor and not in the 1/4" plywood we installed At no point did Bill P [redacted] Srsay the squeaks were not there before As this was his first time at the house, and how would he know this On Monday December 11,Bill P [redacted] Jrcalled Mr [redacted] , not Tuesday Bill P [redacted] Jrasked Mr [redacted] if the 1'4" plywood we installed, if it was moving when he walked on it, and he responded "No" So Bill P [redacted] Jrtold him that it was his original sub floor that was making the squeaks, just like Bill P [redacted] Srtold him at the house Mr [redacted] began to get very upset, yelling and cursing He told Bill P [redacted] Jrhe wanted $because of the squeaks, and if we didn't pay he would take us to court and then would would have to pay $1, He made a reference to an "Ambulance Chaser" We do not understand any of this Bill P [redacted] Jrresponded that we are not paying anything because there is nothing wrong with the floor or the installation You have a new floor with nothing wrong with it Again more with the yelling so Bill P [redacted] Jrtold him, " I guess we will see you in court" Now the customer asking for $1,

I have reviewed the response made by the business in reference to complaint ID [redacted] , and have determined that this does not resolve my complaint. For your reference, details of the offer I reviewed appear below. Regards, [redacted] Hello, I have answered their response below. I stand behind my original statement as being accurate and true. The job took three hours, not over four. P***'s was hired to do the entire job, start to finish. How they chose to do it was left to their discretion. They chose to leave a layer of plywood and old peel and stick tiles over my sub floor and installed the new material over it. I may have said everything looks great but looks aren't the issue. Squeaking is... I attempted to call within days but nobody returned my call. That is why it took two weeks. Anyone stating otherwise is lying... The cabinet contractor carried in and installed custom cabinets. As stated in my original complaint, there was no abuse to the floor, they simply walked on it. If walking on the floor is a problem they should have told me prior to selling it to me. The only large piece of granite counter top was installed from the dining room. It never crossed the kitchen floor. NO CONTRACTORS DAMAGED THE FLOOR. I do not know why it took a few days to begin squeaking. How would Bill P [redacted] determine the new plywood is tight to the floor?? That is physically impossible since it is under the vinyl. He pointed out no imperfections to my sub floor. That is a lie. I offered to add plywood (see pics) reinforcement which I did, because Bill Sr. offered zero useful input. It is covered with liquid nails and was held into place with hydraulic jacks to ensure a tight fit. I also added 2X4's under the plywood for additional support. I then added an entire box of construction lag screws that were just long enough to contact the new plywood from underneath. This repair took me as long as their install. I will say this again, THE FLOOR DID NOT SQUEAK PRIOR TO P***"S INSTALLATION. I am 100% convinced that the problem is with the installation of the new floor. Jonathan P [redacted] was at the house prior to the installation and walked the entire floor. He did not experience any squeaking. I can go in the kitchen today, go to an area on the floor that I have not repaired, get on my hands and knees and make the floor squeak using only my hands. I am not strong enough to move the sub floor with my hands. The problem is in the top of the floor. Bill P [redacted] Jr. did not ask me if the new plywood moves. If he had, I would have replied, I do not know since it is impossible to tell. I did get upset on the phone because I was tired of people giving me the run around. I did curse in the context of the conversation as men sometimes do when they get upset. I did not however direct it at Bill Jr. personally. He in turn got just as upset, yelled just as much as I did, and called me an [redacted] . The "ambulance chaser" reference was an attempt to tell Bill Jr. that I don't typically ask people I do business with for rework or money back. I simply want what I pay for. In this case, I don't feel that I that P***'s lived up to their responsibility. That is why I am filing this claim.

The claim filed with *** is not fraudulent in any way. Anytime a customer has a complaint with a *** Floor, we set up for an independent inspector in inspect the floor. The quality of the installation is also inspected. This is a process.
Ms*** is now changing her story. Please review her original claim, in her first sentence “I had flooring done by Payne’s, and either the flooring itself was defective, or they did shoddy work”
Now that we have proven that the floor is not defective and that she damaged the floor, her statement is “Payne’s filed a fraudulent claim with ***, I never stated the laminate was defective.”
Ms*** complained about the floor, when we inspected it, we know that the unevenness and gaps in the floor were from water damage not installation. She was unhappy with our response.
The inspector noted the moisture on the floor, that’s what is causing the gaps
His notes: The flooring in question was very soiled, dull and showed signs of moisture that was left to dry on the surface. The customer spilled liquids on the floor and never cleaned them up. The damage to the edges can be attributed to improper maintenance
Ms*** has ruined her floor due to customer negligent, leaving water or other liquids on the floor for long periods causing the joints to swell
We aren’t accepting responsibility because we did not leave the liquids on the floor. This is a customer maintenance problem, not an installation issue.
Attached are the photos from the inspectorThey show the water and moisture spots and something sticky on the floor. She is not properly maintaining her floor

Following please find the letter from Shaw declining a warranty claim The inspector noted the floor was very soiled The customer damaged the floor
We have received the inspection report by an independent inspection agency in response to the above claim filed on style #***/*** *** II, color #***/*** *** citing laminate is blisteringEnclosed you will find a copy of the independent inspection report which indicates that the material is exhibiting the following:
• Locally caused damage due to topical moisture and uneven sub-floor
• No manufacturing related concerns found
Based on the conclusion of the information received, there is no cause for further consideration of this matter from a warranty standpointTo obtain a copy of the complete warranty, contact our *** Information Center at ###-###-#### or visit our website at www.***.com
Sincerely
*** ***
SrClaims Manager

Mr*** states in his response that we left a layer of plywood and old peal and stick tiles down over his sub floor and installed the new material over that. That is an absolute lie. He saw us tear up the old floor. We 100% tore up the old floor down to the original sub floor, and it would be very easy to prove that. In his original report, Mr*** states " the floor began to squeak and got pretty bad within about five to six days." Now he says in the second report " attempted to call within days but nobody returned my call. That is why it took two weeks." Again the first time he called was October 30, at 3:p.m. Which is two week later. We have call logs from the phone company to prove that. Why does Mr*** keep changing his story and why does he continue to make things up and lie about things we can easily prove fake? The fact of the matter is that his original tongue and grove sub floor is making the squeaking noise and not the 1/4'' plywood we put down. As shown in Mr***'s pictures is the work he did from the basement to repair his original tongue and groove. He also states that his floor squeaks where he did not make the repair to his original sub floor from underneath. This shows you that it is his original sub floor that is squeaking and not the 1/4'' plywood we installed

To Whom It May Concern;
We installed approximately 900sqft of Laminate flooring throughout the first floor for Ms. *** on February 18th, 19th, 20thWe have been back to the home for service calls after the completion of installation to adjust moldings because they were
knocked loose by the customerOur employee *** (who went out to inspect the job) NEVER told MsJenkins that the job was not properly done, as he was one of the installers on the jobDuring the service call*** observed puddles of liquid (which was assumed to be water) left on the floor, which when left unattended will cause blistering in the boardsThe area of complaint is in the Kitchen in front of the fridgeThe boards are blistered which is consistent to water damageWe believe the current issue of complaint has to do with moisture/water, which is not covered under warranty and is not an installation issueWe have initiated a claim with *** *** (claim ***) to have it inspectedWe are waiting for the results
Sincerely,
*** ***
Claims Specialist

I went out to Mrs*** home on September 18th to measure and provide an estimate. At that time I informed her and her sister that the levels of the floor where uneven, and that metal thresholds would need to be installed because the carpet could not be seamed together and stay togetherShe
stated that she was fine with this and asked for silver metals. This information was written on the contract, which she was provided a copy of. Her carpet and materials were ordered and installation was scheduled for September 26th. On the day of the installation, she called and requested gold metals instead, which we were able to accommodate. During the installation, the carpet installers again informed her sister, who was present during the day, that metals would be used in all doorways due to the floor being uneven. Furthermore, Mrs*** asked at the time of estimate if we would place metals at other doorways that we were not carpeting, which we did out of courtesy. In regards to her complaint that we did not inform her of when the installers were returning to complete the final room which required us obtaining more carpet, this is false. She was told on Tuesday by the installer that they would return either Friday or Saturday to complete the job and she would be called on September 28th. Before we were able to call her on Thursday, she called us in the morning, at which point we told her the installers would be there on Friday to complete the final room. On Friday afternoon, the installer called and provided the customer with an updated time or arrival. After completion of the job on Friday, no complaints were made, nor were any made after the majority of the work was completed on Tuesday. At no point between Tuesday and Friday, did the customer complain about materials, installation, or final productPlease contact us if you require any further information

I have reviewed the response made by the business in reference to complaint ID ***, and have determined that this does not resolve my complaint. For your reference, details of the offer I reviewed appear below. Regards, *** *** Hello, I have answered their response below. I stand behind my original statement as being accurate and true. The job took three hours, not over four. P***'s was hired to do the entire job, start to finishHow they chose to do it was left to their discretion. They chose to leave a layer of plywood and old peel and stick tiles over my sub floor and installed the new material over it. I may have said everything looks great but looks aren't the issue. Squeaking isI attempted to call within days but nobody returned my call. That is why it took two weeks. Anyone stating otherwise is lying... The cabinet contractor carried in and installed custom cabinets. As stated in my original complaint, there was no abuse to the floor, they simply walked on it. If walking on the floor is a problem they should have told me prior to selling it to me. The only large piece of granite counter top was installed from the dining room. It never crossed the kitchen floor. NO CONTRACTORS DAMAGED THE FLOOR. I do not know why it took a few days to begin squeaking. How would Bill P*** determine the new plywood is tight to the floor?? That is physically impossible since it is under the vinyl. He pointed out no imperfections to my sub floor. That is a lie. I offered to add plywood (see pics) reinforcement which I did, because Bill Sroffered zero useful input. It is covered with liquid nails and was held into place with hydraulic jacks to ensure a tight fit. I also added 2X4's under the plywood for additional support. I then added an entire box of construction lag screws that were just long enough to contact the new plywood from underneath. This repair took me as long as their installI will say this again, THE FLOOR DID NOT SQUEAK PRIOR TO P***"S INSTALLATION. I am 100% convinced that the problem is with the installation of the new floor. Jonathan P*** was at the house prior to the installation and walked the entire floorHe did not experience any squeakingI can go in the kitchen today, go to an area on the floor that I have not repaired, get on my hands and knees and make the floor squeak using only my hands. I am not strong enough to move the sub floor with my hands. The problem is in the top of the floor. Bill P*** Jrdid not ask me if the new plywood moves. If he had, I would have replied, I do not know since it is impossible to tell. I did get upset on the phone because I was tired of people giving me the run around. I did curse in the context of the conversation as men sometimes do when they get upset. I did not however direct it at Bill Jr. personally. He in turn got just as upset, yelled just as much as I did, and called me an ***The "ambulance chaser" reference was an attempt to tell Bill Jrthat I don't typically ask people I do business with for rework or money back. I simply want what I pay for. In this case, I don't feel that I that P***'s lived up to their responsibility. That is why I am filing this claim

I have reviewed the response made by the business in reference to complaint ID ***, and have determined that this does not resolve my complaint. For your reference, details of the offer I reviewed appear below. I don't agree with Jonathans response. we never discussed putting metal strips between every room. We did discuss between the kitchen & the living room which I agree are a different level. We also agreed putting it between the upstairs hallway & bathroom & also upstairs nest to the steps. Enclosed is a copy of the contract & no where does it say strips put in every doorway. I have had this house carpeted now for the 3rd time & never ever have them stripped each doorway. I did see the unfinished job on 9/& his installers said they would finish the job when they were sent back but never said they were installing strips in each doorway. I purchased this carpet all in one color to make the job easier & have each room flow together had I of know this was going to be done, I would have gotten different colors in each room. I didn't see the actual completed job until that Friday evening & it was too late to contact their business as they were closed & I did go first thing Saturday morning. To spend $on this job & not be satisfied is not good business. I was NOT told Tuesday by the installers when they would return, as a matter of fact Shawn (*** wouldn't tell me when because he didn't know the rest of the weeks schedule & said someone would contact meOn Friday I made several calls to their business asking when they were coming to finish the job. There are door ways & I have more pictures to show that its not uneven. Regards, *** *** photos and contract included

Revdex.com:
I have reviewed the response made by the business in reference to complaint ID ***, and have determined that this does not resolve my complaint. For your reference, details of the offer I reviewed appear below
Paynes filed a fraudulent claim with ***I never stated that the laminate was defective My complaint was about the installation/workmanship I have mismatches laminate where paynes forgot to install tiles and had to come back and just threw pieces in there The inspector did ask of they did a moisture test and if they let the tiles sit in my home - hrs before installing and I said no, because they didn'tI, nor did anyone damage any tile in the home That's a lie from hell
Paynes is trying to deceive you The "independent" inspector said the tile was not defective; which was never questioned Paynes did a shotty job installing, uneven, gapped, etc The installer said he didn't need to look at all of their work He's seen enoughThey don't want to accept responsibility Please obtain a signed copy of the credit card slip & satisfactory work slip

On Monday October 16th,2017, Bill P*** Jrand two other installers installed a new floor at Mr***'s House. They removed one layer of 1/4" plywood, installed a new layer of 1/4" plywood and then vinyl on top of that. They did not do any work to the original sub floor of the
house. The job took a little over four hours to complete. The job was a 12'x15' kitchen with three installers and no baseboard to install. This is the time it should've taken. Nothing was hurried, nothing was a poor job. Bill P*** Jrwalked the job with Mr*** when they where finished. After the inspection of the new floor Mr*** said " Everything looks great" and paid the balance of the job. Two weeks after the installation, on Monday October 30,at 3:pm, Mr*** called about hearing squeaks, not five days later like Mr*** states. During those two weeks, Mr*** had other contractors in the house to install cabinets and counter tops. On Wednesday November 15,Bill P*** Srwent out to see the job. He inspected the floor and found the 1/4" plywood we installed, was tight to the subfloor. He went down to the basement with Mr***, and saw the imperfections in the customer's tongue and groove sub floor. Bill P*** pointed that out to Mr***. Mr*** said he would try to address that issue. He stated in his letter that some of the work he did below helped. This alone states the squeaks were in the original tongue and groove sub floor and not in the 1/4" plywood we installed. At no point did Bill P*** Srsay the squeaks were not there before. As this was his first time at the house, and how would he know this. On Monday December 11,Bill P*** Jrcalled Mr***, not Tuesday. Bill P*** Jrasked Mr*** if the 1'4" plywood we installed, if it was moving when he walked on it, and he responded "No". So Bill P*** Jrtold him that it was his original sub floor that was making the squeaks, just like Bill P*** Srtold him at the house. Mr*** began to get very upset, yelling and cursing. He told Bill P*** Jrhe wanted $because of the squeaks, and if we didn't pay he would take us to court and then would would have to pay $1,385.00. He made a reference to an "Ambulance Chaser" We do not understand any of this. Bill P*** Jrresponded that we are not paying anything because there is nothing wrong with the floor or the installation. You have a new floor with nothing wrong with it. Again more with the yelling so Bill P*** Jrtold him, " I guess we will see you in court" Now the customer asking for $1,

Mrs*** was informed that metals would need to be installed in all doorways with uneven floors. At the time of installation, the installers checked with the adult present during the time the work was being completed. While this was not the homeowner, it was the sister-in-law of Mrs*** who was moving into the house. The installers told her the metals were being installed and she agreed. At no time did the sister-in-law ask the installers to wait until she checked with the homeowner before continuing. As per our conversation at the time of measurement, Mrs*** was informed that metals needed to be used in order to prevent the carpet from separating. It was not possible to create a seam in the doorways due to uneven floors. Seaming the carpet at the floor was not the best option, as the seams would separate and would require multiple service calls over time and would not be rectified without the use of metals. In one of the photographs, Mrs*** shows a picture of a door into a closet where a metal was not used. This is because the floor at that point is level and did not require one. In regards to her statements about calling her about job completion, she called the store the very next morning (Wednesday) before we had the opportunity to call her, and told her it would be finished Friday or Saturday. She informed us it needed to be done on Friday and we accommodated this requestIt is unfortunate that Mrs*** is unsatisfied with the completed job, however, it was done according to the signed contract and conversation at time of measurement and installation

Check fields!

Write a review of Payne's Carpet Outlet

Satisfaction rating
 
 
 
 
 
Upload here Increase visibility and credibility of your review by
adding a photo
Submit your review

Payne's Carpet Outlet Rating

Overall satisfaction rating

Address: 2406 Military Rd, Niagara Falls, New York, United States, 14304-1558

Phone:

Show more...

Web:

This website was reported to be associated with Payne's Carpet Outlet.



Add contact information for Payne's Carpet Outlet

Add new contacts
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | New | Updated