Sign in

T-C Construction

Sharing is caring! Have something to share about T-C Construction? Use RevDex to write a review
Reviews T-C Construction

T-C Construction Reviews (2)

Review: Everything went well until the day of the pour. There was a 60% chance of rain that day and he decided to pour anyway. They did not start until about 11:15am, he indicated that was the soonest he could get the concrete delivered. Everything went pretty well for about 2 hours and then the sky opened up and it poured the rain. They had only completed about 2/3 of job so there was a lot of scrambling. Then the problems started to become obvious. He had applied a concrete rdant to slow the cure of the concrete. That did not work. I don't know if he did not put enough on or applied it too late. Once they started scrubbing of the top layer it was obvious they were not going to remove enough to expose the rock. I brought that to the contractors attention and he said don't worry we will just scrub it some more. I got so concerned I grabbed a broom and started scrubbing, then I realized it was not coming off. He then said they could fix it the next day with the pressure washer. He did not. I have attached a picture of the new concrete next to the old concrete. One place was under the eve of the home so the rain running off the roof dug a big valley right through the concrete. The contractor did nothing to fix. They immediately started removing the forms and I included one picture of a chunk missing from the edge but there are dozens of chunks missing all along the edge. To form up the curved portion of the frame he used a MDF product and it just melted under the rain so the curves are as crooked as a snakes back. The surface is rough, uneven with chucks tore out and mostly gray because they could not get the surface grout offDesired Settlement: refund $2000.00 of amount paid

Everything went well until the day of the pour. There was a 60% chance of rain that day and he decided to pour anyway. They did not start until about 11:15am, he indicated that was the soonest he could get the concrete delivered. Everything went pretty well for about 2 hours and then the sky opened up and it poured the rain. They had only completed about 2/3 of job so there was a lot of scrambling. Then the problems started to become obvious. He had applied a concrete rdant to slow the cure of the concrete. That did not work. I don't know if he did not put enough on or applied it too late. Once they started scrubbing of the top layer it was obvious they were not going to remove enough to expose the rock. I brought that to the contractors attention and he said don't worry we will just scrub it some more. I got so concerned I grabbed a broom and started scrubbing, then I realized it was not coming off. He then said they could fix it the next day with the pressure washer. He did not. I have attached a picture of the new concrete next to the old concrete. One place was under the eve of the home so the rain running off the roof dug a big valley right through the concrete. The contractor did nothing to fix. They immediately started removing the forms and I included one picture of a chunk missing from the edge but there are dozens of chunks missing all along the edge. To form up the curved portion of the frame he used a MDF product and it just melted under the rain so the curves are as crooked as a snakes back. The surface is rough, uneven with chucks tore out and mostly gray because they could not get the surface grout off

Check fields!

Write a review of T-C Construction

Satisfaction rating
 
 
 
 
 
Upload here Increase visibility and credibility of your review by
adding a photo
Submit your review

T-C Construction Rating

Overall satisfaction rating

Description: Construction & Remodeling Services

Address: 2926 Wegner Rd, New Braunfels, Texas, United States, 78132

Phone:

Show more...

Add contact information for T-C Construction

Add new contacts
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | New | Updated