We were hired to Design a Kitchen For Steven [redacted] Again we are in no way General Contractors , I am in the business of designing and providing Custom Cabinetry, I will for a fee help people with the construction management required to implement job and designThe Customer assumes all liability and payment directly for work performed by whomever requiredAs well as any or all required permitsPlease find Design retainer & Drawings along with budget prepared for them for this projectUpon receipt of the dollar design retainer please see attached, The client came up with a new idea of doing a small Kitchenette on their third floor to live out of that could be done before they started any work on the KitchenI agreed to Design a third floor Kitchenette and let them use dollars of the design retainer , which was only intended for main Kitchen towards the design and cabinetry of the third floor Kitchenette Please see attached drawings as well as a proposal for the cabinetryUpon receipt of deposit 4,we proceeded to start on cabinetry, When trying to obtain Appliance information to make the cabinetry, after sending people over to [redacted] (Rhonda [redacted] who I have worked with for more than years and will attest for how much successful work we have done together) they added a beer tapper and an ice maker which really complicated job Also I would like to add there was no project management fee charged for third floor or the removal of a Piano which we did down a servant stair for this customer free of chargeProposal was for cabinetry onlyIn his claim he talks about a large sum of money paid for project managementFirst off Ice maker they picked required a drain and this is on third floor of a year old house with no access for drains, I proceeded to re design entire space and Kitchenette grew in size over ftin both directions to fit everything they wanted this both cost a lot of money and delayed projectAs to the main Kitchen which I was hired for Steven had told me he needs to make more money to try and get that startedWe had many delays to this project but in the end offered a resolution to finish , please see attached letter to his attorney On December 22nd I was hospitalized with an emergency and we reached out to tell Mr [redacted] , but also with the assurance that we still felt we could complete his job as proposed to his attorney [redacted] says on social media we took his money and ran and are lying about being hospilized, please see hospital record attached As to his claim of wanting 4,dollars , he still owes 4,and tells me he hired someone else to finish and he had to pay 3,please see email from [redacted] threating to ruin me if I don’t give him the 3,dollars , but know he is asking you for 4,? In Addition he is trying to say the original design retainer which had nothing to do with this kitchenette is payment for the work, I would like you to note we provided to Mr [redacted] what design retainer was set out for, Drawings and the budget which he is in possession of and I am sure he will use with whomever he works with on Kitchen ProjectI have obtained legal service to help in the resolution, but did not want this claim to go un answeredI have been in business for more than years and have never had to deal with your organization until this year, In closing I take these allegations very serious [redacted] continues to try and slander my reputation thru all social media outlets utilizing his opinions with Mallis, after not allowing us final right to cure Best Regards, Tad [redacted] n Tad [redacted] n DesignHandmade Cabinetry & Fine Woodwork Milwaukee ~ Chicago Phone: [redacted] Email: [redacted] ***

We were contracted to design and provide her Kitchen Cabinetry , I am not a General Contractor , Kimberly was her own General Contractor on this job , I helped with supervision and providing her contractors to do the job, Had she stuck to the Kitchen Scope everything would have been
fine What she doesn’t tell you is , she also had us working to re do her Master Closet, Her entire Hydronic heating system, Back hall and creating a new laundry room on the first floor , all in addition to what she is complaining about, she also would not pay any of the sub-contractors in full , to the point where nobody will come back to work there. Nothing at Kimberly’s house could be done fast enough or cheap enough and added things every other day ! I worked for Kimberly’s Father the year prior for about the same dollar value with 100% Success which is the only reason I worked for her against my better judgement. Please let me know when you are available to meet in person to articulate the details . I will be meeting with her tomorrow morning at , but with no guarantee I will be able to do what she may be looking for , as I suspect they are things she is looking for more to be done without paying I look forward to hearing back from you on this matter . Best, Tad Hellmann DesignHandmade Cabinetry & Fine WoodworkMilwaukee ~ Chicago Phone: 414-303-6010Email: [email protected] Jackson Street, Suite 102Milwaukee, WI

Revdex.com:
I have reviewed the response made by the business in reference to complaint ID 11922953, and have determined that this does not resolve my complaint. For your reference, details of the offer I reviewed appear below
I'm really not inclined to be drawn into a debate about the materials used for the limited amount of work that was completedWhile there is indeed plenty of the work that had to be corrected and re-done, my biggest complaint is that the job had been abandoned and the work left unfinished for monthsI signed the design retainer, but not the second document Mr***n produced.Regardless, the net result is that he was paid approximately $9,000, and he delivered half a job at his own admission. I reiterate his own words, "I am willing to accept the fact that I failed on this jobI'm sure your carpenter can do a great job finishing it upI am very sorry for how this turned out."The job is now finished by another carpenter, at an additional cost of $4627.50, including the cost of the stainless steel cabinet doors from *** through *** *** on *** *** *** This additional payment to another carpenter and for materials never produced by Mr***n represents about 1/of the monies already paid to Mr***n.This is why I am asking for the $4,back(actually, it should be $4,627.50, but I would be firm on accepting $4,000.)Thank you for your consideration,Steve ***
Regards,
Steven ***

The documents I have in my possession have been signed by *** and our his wife, I didn’t make anything up and the Design Retainer is not 100% applicable to the kitchenette, that is all spelled out and signed. As to the Stain, it is a very Dark Stain, It is not Paint. The Stain is a custom formulization Made By Mohawk , which is the finest stain money can buy if you look into the industry, and the finish coat is a Catalyzed Conversion Varnish By Chemcraft also the top of the line finish , please look into if you would like there are no better products for wood finishing available , the framing he speaks of with the yellow glue is a sub knee wall which is totally covered and not seen . Thanks Again, Tad

All loose ends along with a little additional work has been completed for Kimberly [redacted] Mother Anne & Husband Charles are very happy and impressed with work completed. Best Regards, Tad

We were hired to Design a Kitchen For Steven [redacted] . Again we are in no way General Contractors , I am in the business of designing and providing Custom Cabinetry, I will for a fee help people with the construction management required to implement job and design. The Customer assumes all...

liability and payment directly for work performed by whomever required. As well as any or all required permits. Please find Design retainer & Drawings along with budget prepared for them for this project. Upon receipt of the 3500 dollar design retainer please see attached, The client came up with a new idea of doing a small Kitchenette on their third floor to live out of that could be done before they started any work on the Kitchen. I agreed to Design a third floor Kitchenette and let them use 500 dollars of the design retainer , which was only intended for main Kitchen towards the design and cabinetry of the third floor Kitchenette . Please see attached drawings as well as a proposal for the cabinetry. Upon receipt of deposit 4,667.50 we proceeded to start on cabinetry, When trying to obtain Appliance information to make the cabinetry, after sending people over to [redacted] (Rhonda [redacted] who I have worked with for more than 20 years and will attest for how much successful work we have done together) they added a beer tapper and an ice maker which really complicated job . Also I would like to add there was no project management fee charged for third floor or the removal of a Piano which we did down a servant stair for this customer free of charge. Proposal was for cabinetry only. In his claim he talks about a large sum of money paid for project management. First off Ice maker they picked required a drain and this is on third floor of a 100 year old house with no access for drains, I proceeded to re design entire space and Kitchenette grew in size over 2 ft. in both directions to fit everything they wanted this both cost a lot of money and delayed project. As to the main Kitchen which I was hired for Steven had told me he needs to make more money to try and get that started. We had many delays to this project but in the end offered a resolution to finish , please see attached letter to his attorney . On December 22nd I was hospitalized with an emergency and we reached out to tell Mr. [redacted] , but also with the assurance that we still felt we could complete his job as proposed to his attorney . [redacted] says on social media we took his money and ran and are lying about being hospilized, please see hospital record attached As to his claim of wanting 4,000 dollars , he still owes 4,667.50 and tells me he hired someone else to finish and he had to pay 3,000 please see email from [redacted] threating to ruin me if I don’t give him the 3,000 dollars , but know he is asking you for 4,000 ? In Addition he is trying to say the original design retainer which had nothing to do with this kitchenette is payment for the work, I would like you to note we provided to Mr. [redacted] what design retainer was set out for, Drawings and the budget which he is in possession of and I am sure he will use with whomever he works with on Kitchen Project. I have obtained legal service to help in the resolution, but did not want this claim to go un answered. I have been in business for more than 30 years and have never had to deal with your organization until this year, In closing I take these allegations very serious. [redacted] continues to try and slander my reputation thru all social media outlets utilizing his opinions with Mallis, after not allowing us final right to cure.   Best Regards, Tad [redacted]n      Tad [redacted]n DesignHandmade Cabinetry & Fine Woodwork           Milwaukee ~ Chicago Phone: [redacted]Email: [redacted]

[A default letter is provided here which indicates your acceptance of the business's response.  If you wish, you may update it before sending it.]
Revdex.com:
I have reviewed the response made by the business in reference to complaint ID [redacted], and find that this resolution is satisfactory to me. Tad has completed the work agreed upon and he has been paid in full.  
Regards,
Kimberly [redacted]

Check fields!

Write a review of Tad Hellmann Design

Satisfaction rating
 
 
 
 
 
Upload here Increase visibility and credibility of your review by
adding a photo
Submit your review

Tad Hellmann Design Rating

Overall satisfaction rating

Add contact information for Tad Hellmann Design

Add new contacts
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | New | Updated