I had my front drive way and my back steps redone on April 19thThere was no pea gravel laid before the concrete was poured, there were only four pieces of rebar put in and they only covered the top half of the drive way there was nothing to support the bottom half of the drive wayIn the back of the house the top step measures 12inand the bottom step measures 17inNot to mention once the concrete was dry and they came back to remove the supports there were holes in the fronts of the stepsA long with that they left a large pile of concrete in the street in front of my houseI have called multiple times for them to come and remove the concrete and fix the stepsWhen I first started calling I was told they were going to come and fix everything and that lasted for about a week and now that its been three weeks since then and I'm still calling no one is even answering the phonesI have left several messages and still haven't gotten anything accomplished!
I had my front drive way and my back 2 steps redone on April 19th. There was no pea gravel laid before the concrete was poured, there were only four pieces of rebar put in and they only covered the top half of the drive way there was nothing to support the bottom half of the drive way. In the back of the house the top step measures 12in. and the bottom step measures 17in. Not to mention once the concrete was dry and they came back to remove the supports there were holes in the fronts of the steps. A long with that they left a large pile of concrete in the street in front of my house. I have called multiple times for them to come and remove the concrete and fix the steps. When I first started calling I was told they were going to come and fix everything and that lasted for about a week and now that its been three weeks since then and I'm still calling no one is even answering the phones. I have left several messages and still haven't gotten anything accomplished!
I had my front drive way and my back steps redone on April 19thThere was no pea gravel laid before the concrete was poured, there were only four pieces of rebar put in and they only covered the top half of the drive way there was nothing to support the bottom half of the drive wayIn the back of the house the top step measures 12inand the bottom step measures 17inNot to mention once the concrete was dry and they came back to remove the supports there were holes in the fronts of the stepsA long with that they left a large pile of concrete in the street in front of my houseI have called multiple times for them to come and remove the concrete and fix the stepsWhen I first started calling I was told they were going to come and fix everything and that lasted for about a week and now that its been three weeks since then and I'm still calling no one is even answering the phonesI have left several messages and still haven't gotten anything accomplished!
I had my front drive way and my back 2 steps redone on April 19th. There was no pea gravel laid before the concrete was poured, there were only four pieces of rebar put in and they only covered the top half of the drive way there was nothing to support the bottom half of the drive way. In the back of the house the top step measures 12in. and the bottom step measures 17in. Not to mention once the concrete was dry and they came back to remove the supports there were holes in the fronts of the steps. A long with that they left a large pile of concrete in the street in front of my house. I have called multiple times for them to come and remove the concrete and fix the steps. When I first started calling I was told they were going to come and fix everything and that lasted for about a week and now that its been three weeks since then and I'm still calling no one is even answering the phones. I have left several messages and still haven't gotten anything accomplished!