His first complaint is about the buyer walk, which is always held just before settlementAt this walk defects are pointed out and listed on a "punch list" [redacted] purchased a model home, which was used and sold in "as is" conditionThe only work included in the sale, where minor paint and caulk touch up'sA punch list was compiled and [redacted] signed acknowledging the items on the listThe punch list is then copied and distributed along with other closing documents to all parties involvedAt no time would we have refused to give him a copyAs of today, all items that we agreed to correct are complete.The second item in his complaint is a water leak, which happened on the floor above his master bathThe leak was repaired in the unit above and the damage in [redacted] unit was repairedThe master bath shower light was replaced with a new fixtureAt this point is where the ball was droppedAll the drywall touch up was complete but scheduling the painter to do touch up work fell through the crackWe have since sent the painter to his unit and [redacted] said he was getting the whole unit repainted.As to him not receiving the Deed to his unit, this is a T [redacted] Sometimes it takes a few months for this document to get back to the homebuyer.In closing the Moser Group feels that we could have done better with the paint touch up as it pertains to the shower leak [redacted] still has a warranty period which The Moser Group still stands behind

His first complaint is about the buyer walk, which is always held just before settlement. At this walk defects are pointed out and listed on a "punch list". [redacted] purchased a model home, which was used and sold in "as is" condition. The only work included in the sale, where minor paint and caulk...

touch up's. A punch list was compiled and [redacted] signed acknowledging the items on the list. The punch list is then copied and distributed along with other closing documents to all parties involved. At no time would we have refused to give him a copy. As of today, all items that we agreed to correct are complete.The second item in his complaint is a water leak, which happened on the floor above his master bath. The leak was repaired in the unit above and the damage in [redacted] unit was repaired. The master bath shower light was replaced with a new fixture. At this point is where the ball was dropped. All the drywall touch up was complete but scheduling the painter to do touch up work fell through the crack. We have since sent the painter to his unit and [redacted] said he was getting the whole unit repainted.As to him not receiving the Deed to his unit, this is a T[redacted] Sometimes it takes a few months for this document to get back to the homebuyer.In closing the Moser Group feels that we could have done better with the paint touch up as it pertains to the shower leak. [redacted] still has a warranty period which The Moser Group still stands behind.

Check fields!

Write a review of The Moser Group

Satisfaction rating
 
 
 
 
 
Upload here Increase visibility and credibility of your review by
adding a photo
Submit your review

The Moser Group Rating

Overall satisfaction rating

Address: 300 Brookside Ct, Chalfont, Pennsylvania, United States, 18914-2051

Phone:

Show more...

Web:

www.themosergroup.com

This site can’t be reached

Shady, yet now dead: once upon a time this website was reported to be associated with The Moser Group, but after several inspections we’ve come to the conclusion that this domain is no longer active.



Add contact information for The Moser Group

Add new contacts
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | New | Updated